OPS.8.1:4.3 - Test what capacity the next start leaves
Begin with the simplest consequence that can decide the question. In a fixed horizon, the known remaining occupancy, the proposed job’s occupancy and a chosen allowance for returns can be compared with usable resource time.
For example, a resource with five usable hours cannot complete two hours of existing work, two hours of a protected return and two hours of new work within that horizon. Even when enough hours are available in total, readiness, precedence, joint resource requirements or an uninterrupted window may prevent a feasible placement. OPS.10.2 constructs that schedule or obstruction.
Match the comparison to the promised protection:
- For a stated return scenario, place that return and the new work with their readiness, access and deadlines.
- For protection over a bounded family, show that the selected response can handle every member of that family.
- For a probability threshold, use any justified bound that decides it under the operating policy. If every permitted return can be served, that policy already covers the entire range. When the answer depends on the frequency or co-occurrence of returns, use the relevant evidence and a qualified joint model through OPS.10.1.
A policy that reacts to feedback must use information available at the time of its choice. If release is allowed before inspection, the policy needs an executable response when inspection later requires a return. It cannot choose an early start only in retrospect for the outcomes in which no correction was needed.
A workload-control norm can instead be a calibrated congestion-control quantity. Retain its definition and units: a route-position-weighted load is not the same quantity as occupied hours available before a deadline. Use its operating comparison for its intended purpose, and a finite schedule when the deadline question requires one.