Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:05:20 UTC

OPS.6 - Continue Cases and Handle Exceptions

Status: Stable

OPS.6:0 - Use This When

Use this pattern during one admitted continuing case when current facts, an exception, or a changed condition makes the standard next action uncertain. Typical cues are “the normal route no longer fits”, “the ticket moved but nothing changed”, “the model recommends a fix”, “we are waiting for one more result”, or “who may act now?” while the case subject, permission, performer, evidence, and next permissible Work are unclear.

Return the result the recipient needs. Who may act now can be decided from current authority and operating conditions. Whether the case has changed calls for evidence of the subject at the relevant time. To establish what the selected action achieved, connect its performance to the observed result.

Continuation and its result: for case subject S at horizon H, permission P and Method M can support Work W by performer R, with fallback F and evidence E expected at the next return. Report execution when the evidence establishes it. For the state at that return, use evidence of the subject and relevant external conditions. Attribute a change to W when its performance and contribution are established.

Blocker: condition K is missing, stale, contradicted, unauthorized, unsafe, unsupported, or unavailable; the result needed from source O is specified; the safe fallback or stop is F; reconsider when T makes that useful.

Before acting, establish the permission and conditions for the proposed work. At the next return, establish the subject’s state from evidence for that time. An event outside the selected work can change the state in the meantime.

Do not use OPS.6 to design one universal workflow or case lifecycle, reconstruct a reusable Method from event data, or revise priority merely because the case is old. A change of label can leave the work untouched. An entry that enacts an authorized decision or records an established result can supply grounds for the change of state it reports. Use A.15.7 for the general situation-responsive next-action Method, A.3.1.MR when reusable Method recovery from several performances is the actual question, and OPS.7 when temporal or consequence evidence can change priority or an existing commitment.

OPS.6:0.1 - Working Distinctions

Name used hereMeaning
caseOne bounded continuing Work situation organized around an exact subject, state, commitments, evidence, authority, and permissible next Work. It is not its file, ticket, queue position, or every Work item within it.
case subjectThe patient, incident, user issue, release candidate, service relation, request, physical item, or other identified subject around which continuation is being coordinated.
case-state claimA qualified claim about the case subject and relevant relations at a stated time or horizon. Revise it when warranted by new evidence, a corrected interpretation or a change in its conditions of use.
exceptionA fact or condition for which the standard continuation branch is absent, contradicted, no longer adequate, or requires bounded choice or return. It is not automatically an error or rare event.
matching admission and permissionThe applicable case admission and independently supported current permission for the same matter, effective conditions, configuration, and horizon. A valid OPS.5 result may carry both; admission alone is not permission.
deciding SystemThe System authorized to select or confirm the next permissible Work. It may differ from the responsible performer.
responsible performerThe System assigned and capable for the selected Work under its conditions. Assignment, capability, permission, authority, and performance remain distinct.
next permissible WorkThe exact Work that may occur next under the applicable domain Method, permission, obligations, evidence, and stop conditions. A task description or tool call alone does not show that this Work was performed.
action choiceA selected next Work, probe, fallback, stop, or return. Choice does not perform the Work or progress the case.
Work occurrenceDated performance under the relevant configuration. An execution record, a qualified observation or a known rule tied to an established event can supply evidence of that performance. Establish which action the evidence covers.
evidence expected from performanceThe observations, produced results, or records needed to judge what occurred. State the claim each supports, including any claim of a changed subject state or a failure.
record updateA change to a ticket, case file, plan, model, trace, database, or dashboard. It may carry evidence but is not the case-state change by itself.
unmet conditionThe exact missing, stale, contradicted, unauthorized, unsafe, unsupported, or unavailable condition that prevents a truthful next action or progressed state, together with its return or stop.
progression resultA warranted next action, evidence of the work actually performed, the supported state at the relevant time, or a missing condition with its owner, fallback and return, as required.

OPS.6:1 - Problem Frame

Continuing cases do not simply advance because a standard sequence exists. New observations, dependency failures, changed permissions, resource relations, specialist decisions, or unexpected outcomes can make yesterday’s next action unsafe, impossible, or irrelevant. The operation still needs a bounded way to continue without replacing the applicable clinical, engineering, legal, safety, security, or other domain Method.

Select the next permissible Work from the current situation. Report the state and its changes from evidence about the subject. To credit a selected intervention, establish what was performed and what it contributed. Identify any prerequisite missing for the requested continuation.

OPS.6:2 - Problem

A selected workflow transition can be mistaken for performed Work or an evidenced change in the case. A case-file state, agent loop, plan update, model recommendation, or “done” ticket appears to settle the case even when no authorized performer acted or the resulting subject state is unknown.

The opposite failure treats every exception as improvisation. Practitioners bypass mandatory domain branches, create an ungoverned OptionSet, or keep analyzing without a responsible performer, stop, evidence expectation, or return. Cases then drift between records while obligations and commitments remain unresolved.

OPS.6:3 - Forces

ForceTension
responsiveness versus currentnessCases need timely continuation, but stale facts or permission can make the selected action inapplicable or harmful.
domain Method versus local exceptionThe applicable Method constrains permissible Work, yet current facts may require recognition, adaptation, comparison, probe, or return.
chooser versus performerThe System that decides may not perform; collapsing them hides assignment, capability, permission, and responsibility.
action versus evidenceSelecting a good action is useful, but it does not show that Work occurred or the case changed.
recordability versus subject truthFiles and transitions support coordination, but they represent rather than constitute the case subject and state.
automation speed versus authorityAutomated episodes can run quickly, but tool access and output do not establish permission, software assurance, release, or accountable continuation.
progress pressure versus honest blockerA visible “next state” is attractive, while naming an unmet condition may be the only truthful result.

OPS.6:4 - Solution

OPS.6:4.1 - Confirm the case and matching permission

Name the case subject, configuration, time and the state or action at issue. For a question about the current state, use evidence for that state, including the effective permission when that is what was asked. Before choosing further work, recover its admission and the permission it requires under present conditions. A valid OPS.5 result may supply both. Return a missing permission to the authority that can decide it. An answer about the current state can be given while permission for a next action is pending.

OPS.6:4.2 - Establish the current conditions for continuation

Recover the current qualified case state, applicable domain Method, obligations and operating commitments, the evidence for continuing and the conditions under which it is still current, relevant permissions and authority, and the condition that made continuation uncertain. Follow the claims that can change the next action, the conditions for relying on it or the conclusion the recipient needs. Reuse unaffected case claims within their established conditions.

OPS.6:4.3 - Separate decision, performance, records, and state

For a proposed action, identify who can decide and perform it, the required authority, the available means, and the result that would be due. Before assigning that work, resolve any missing capability, access or permission on which it depends. For an account of the state at a date, identify the decision or event that determines it and the evidence for that claim. A person who can establish the state may have no authority to change it.

OPS.6:4.4 - Use the least elaborate adequate steering branch

Apply the direct mandatory branch when a current rule and facts determine the next permissible Work. Use recognition when one current situation clearly matches a governed action. Adapt within the applicable domain Method when a bounded variation is authorized. Use C.11 only when several admissible live actions genuinely require comparison. Select a bounded probe when its expected result could improve the decision or its grounds enough to warrant the burden. When no permissible action is available, report the stop and its basis. Seek another candidate or a missing contribution through the relevant practice if it can give the recipient a useful continuation.

OPS.6:4.5 - Specify the executable continuation contract

State the selected next Work, responsible performer, permission and effective conditions, stop or fallback, expected evidence, and the return to continuing operation. Name the observable change that would invalidate the action and require refresh. An existing plan, instruction, prompt, ticket-transition record, or model recommendation can carry this contract if it states these terms and identifies the required authorization.

OPS.6:4.6 - Admit performance and update state separately

For a claim that selected Work changed the case, establish its performance and contribution under the conditions that applied. For the state of the subject, use sufficient evidence about that state. An independent event, an effective decision recorded in the case system or the same conclusion under all histories still possible can settle it. If the selected Work did not occur, report that result when relevant and use the remaining evidence for the state. An expired claim about earlier conditions requires fresh grounds before it can support a current decision.

OPS.6:4.7 - Return one usable result

Return what the original commission requires:

  • a permissible next action with its responsible performer and effective conditions,
  • the supported performance and its result as far as known,
  • the state at the relevant time, its evidence and limits, fulfilled or still-open obligations and next return, or
  • the unmet condition, direct owner or source of the needed result, safe fallback or stop, and exact retry condition.

Return a required priority, commitment or policy decision to its Operations owner, and a specialist decision to the practice that can supply it. The continuation result does not inherit their authority.

OPS.6:5 - Archetypal Grounding — Three Continuing-Case Replays

OPS.6:5.1 - PumpWorks field incident

Continue the constructed matter in OPS.5:5.1. At 09:05, incident I73 remains unresolved on installation P4. A field report describes intermittent pressure readings; neither their cause nor correction is known. The incident lead has authorized engineer E18 to inspect the identified captured logs until 11:00. The permission allows reading and diagnosis, not altering the deployed controller, declaring safety or releasing R42.

The applicable diagnostic procedure says: compare the captured sensor and controller timestamps; if the discrepancy persists in the captured interval, retain the discrepancy claim and request live verification; if identity fails or the data are corrupt, stop and return to the log owner. This direct rule is sufficient—no alternative-ranking exercise is needed. The incident lead chooses the bounded continuation; E18 performs it. The expected evidence is the identified input, execution trace, comparison result and its time interval.

The supplied observations are: E18 performed the comparison from 09:05 to 09:25; the retained trace identifies the P4 capture and comparison; a timestamp mismatch occurs in that capture; no live verification or controller change was performed. The defensible update is “discrepancy established in the captured interval; live cause and present field condition unresolved.” It is progress in diagnosis, not restoration of the installation. E18 returns the trace and this limited claim to the incident lead, closes I73-D at a safe stop and requests observational live verification in the 10:00–11:00 contact window. At 09:30 the field owner confirms access and the required permission for that bounded observation, without authorizing a setting change.

At 09:50 the field contact withdraws availability. The lead cannot start live verification under the earlier access assumption. The result becomes a returned access-and-permission condition, with the field owner as recipient and confirmed contact plus matching permission as the retry condition. Offline analysis of the already authorized capture remains allowed. The separate R42-T9 lab procedure, fixture check and performer are unaffected and remain in use; its result at 10:10 can support only its laboratory criterion. The operation does not erase the captured discrepancy or assert a current safe field state from the lack of a new report.

The next participant receives the bounded diagnostic result, the live-verification blocker, still-permitted work and the next useful contact action. For a priority or promise decision, use those facts through OPS.7 and identify who has the authority for each proposed change to priority or the promise.

OPS.6:5.2 - Public-hospital clinical case

One admitted clinical case continues from the exact patient and clinical-case subjects, current observations, applicable clinical and operating Methods, authorized practitioners, bed and resource relations, service obligations, and current consent, privacy, safety, and statutory conditions. A qualified clinical System retains medical decisions.

Use the authorized clinical result and applicable operating criteria to identify the next permitted Work, its responsible performer, stop or fallback, and the evidence needed to update the case-state claim. Missing consent, clinical evidence, bed relation, competence, medical-safety return, or statutory permission remains an unmet condition, not an Operations workaround. A record closure, bed-board move, or elapsed wait does not establish treatment, patient change, or clinical resolution.

OPS.6:5.3 - AI-assisted user issue

An admitted user issue encounters a changed trace, tool result, provider condition, model input, candidate change, or harness state. The operation refreshes evidence and applies the software domain Method and current established authority. It distinguishes the human or other deciding System, the responsible performer, agent episode, tool invocation, candidate change, test evidence, issue record, and release decision.

The continuation contract may authorize one bounded diagnostic, test, or repair Work with context and tool limits, stop, fallback, expected evidence and the responsible recipient, including a human reviewer when the case requires one. Use current evidence about the issue or candidate to report its state. To credit the selected work with a change, establish its execution and contribution. A successful episode, green local test, visible trace, automated loop, or generated patch does not by itself establish issue progression, an integrated change, software assurance, a security result, or release permission.

OPS.6:6 - Bias-Annotation

Bias or pressureHow it distorts continuationCountermeasure
workflow-state biasA configured transition becomes the case truth.Recover the exact case subject, performance evidence, and qualified state separately.
action biasSelecting any next step feels better than returning a blocker.Use direct mandatory and recognition branches first; return when no permissible action exists.
automation biasA successful agent episode or model output is treated as progress.Separate invocation, Work, artifact, evidence, integration, and case-state claims.
plan-completion biasUpdating a plan or checklist appears to satisfy the obligation.Name the actual Work, responsible performer, result, and evidence expected.
stale-permission biasEarlier permission is reused after conditions changed.Match matter, conditions, configuration, horizon, and authority before selection.
expert-shadowing biasOperations quietly substitutes for clinical, safety, legal, or engineering judgement.Use a qualified specialist result or ask its provider for the needed answer. Make the coordination decision within the operating authority.
exception novelty biasEvery surprising event is treated as unprecedented improvisation.Reuse the applicable domain Method and choose the least elaborate adequate branch.

OPS.6:7 - Conformance Checklist

  • The exact case subject, configuration, horizon, and served demand or commitment are named.
  • For an action that needs permission, the permission covers the same matter, performer and conditions.
  • The account identifies the case state, obligations, evidence and method that bear on the commissioned decision.
  • For Work selected to proceed, identify the authorized chooser and the capable, assigned performer. If either is missing, identify the condition that prevents action. Use evidence of performance and its effect for claims about them.
  • Direct mandatory or recognition branches are used when adequate.
  • C.11 is used only when several admissible live actions genuinely require comparison.
  • When further Work is selected, the continuation contract identifies its performer, conditions, intended result, evidence and any required stop, fallback or return.
  • The reported state has evidence about the case at the relevant time. A change attributed to the selected Work has evidence of its performance and contribution.
  • The result settles the commissioned question about the permitted next action, the state or the selected performance, or identifies the missing condition, owner, fallback or stop, and when to reconsider.
  • Specialist and wider Operations results remain with their owners.

OPS.6:8 - Common Anti-Patterns and How to Avoid Them

Anti-patternFailureRepair
workflow transition equals progressA representation substitutes for changed case state.Establish what the transition means under the applicable rule. Use an authorized transition for an effect it brings about. For a claim about other work, establish its performance from suitable evidence.
selected action equals WorkA choice or instruction becomes a performance claim.Name performer and admit the dated Work separately.
agent ran, therefore case advancedInvocation and output hide authority, integration, and subject evidence.Preserve episode, Work, artifact, test, integration, decision, and state distinctions.
generic exception handlerOne fallback overrides domain Methods and specialist returns.Recover the applicable Method and exact unmet condition.
chooser-performer collapseDecision authority, assignment, capability, and performance become one relation.Name and support each relation independently.
stale authorization carryoverPermission survives changed conditions by default.Revalidate exact matter, configuration, horizon, and effective conditions.
endless analysisNo responsible performer, stop, evidence expectation, or return is stated.Produce the executable continuation contract or a blocker return.

OPS.6:9 - Consequences

The operation gains a defensible continuation move for exceptional and changing cases. Practitioners can tell what may happen next, who should perform it, what evidence will count, when to stop, and whether the case truly progressed or remains blocked.

Checking performance and the subject’s state takes time and may require evidence from another participant. When that evidence is missing, the recipient can act on the specific limitation without mistaking a record change for progress.

OPS.6:10 - Rationale

Case continuation sits between permission and evidence. If it collapses into admission, selection appears to perform Work. If it collapses into priority or commitment management, elapsed time or consequence pressure can bypass the applicable domain Method. Keeping the continuation contract and the later state update separate makes exceptions usable without inventing a lifecycle.

Identifying the authorized and capable performer can complete an assignment about the next action. Evidence about the subject can establish its state independently of whether that action has been performed. A missing condition with its owner, safe fallback and opportunity to retry can also complete a feasibility inquiry. It prevents administrative state changes from hiding missing permission, capability, evidence, or specialist conclusions.

OPS.6:11 - SoTA-Echoing

The decision is how to continue a case after new facts while reporting a defensible result. A strong incumbent combines authorized case planning with outcome-aware execution. CMMN 1.1, §4.1 and §5.4.9 supplies runtime discretion, procedural subwork and planning authorization. Current DCR robot documentation distinguishes effect success, failure and timeout and the associated continuation. OPS adopts these mechanisms.

In I73, such an arrangement can authorize log inspection, execute a diagnostic activity and route a failed or unavailable live verification. If its case contract already states the capture identity, evidence interval, external subject claim and receiving authority, it produces the same adequate continuation as OPS.6. A second contract would only add synchronization work. The residual arises when an engine’s successful diagnostic activity is used as evidence that the physical installation is now restored. Sections 4.5–4.7 bind the operation’s observation to its warranted subject-state claim: the capture shows a discrepancy; present field condition remains unresolved. Loss of contact stops the dependent action without invalidating independent laboratory work.

That addition costs the domain mapping from execution outcome to observation and subject claim, a check of current permission, and a return the next participant can use. Use a sufficient direct procedure and its existing evidence. Additional logging is warranted when the receiving decision needs it and the cost or delay is acceptable within the applicable requirements.

FPF A.15.7 supplies situation-responsive steering and C.11 the conditional comparison branch. DEMO helps distinguish production and coordination; software-runtime sources inform bounded automation and stopping. Their execution semantics, source-local roles and software evidence do not grant external domain authority. Reopen when the incumbent already preserves the same physical-subject and permission distinctions more cheaply, or changed evidence, permission or execution semantics defeats the current continuation.

OPS.6:12 - Relations

  • OPS.5 supplies admission and may carry independently grounded start permission for the same matter and effective conditions.
  • A.15.7 governs the general situation-responsive steering Method. A.3.1.MR separately governs candidate reusable Method recovery from several performances or other direct evidence.
  • C.11 governs comparison only where several admissible live actions require choice. A.10 governs evidence reliance; A.15.8 governs the performance configuration or recovery dependency when that is current.
  • For an OPS.7 decision, use the evidenced progression or unmet condition when it bears on a priority, commitment or the grounds for retaining either. Establish who can revise priority and who can revise the commitment when those decisions arise.
  • OPS.8–OPS.13 retain wider queue, capacity, interacting-structure, and commitment-account questions.
  • Clinical, medical-safety, privacy, legal, software assurance, security, release, provider and capability questions retain their specialist grounds. Establish who is entitled to make any decision the work requires, including the person or representative entitled to give consent under the applicable terms.
  • Practitioners may enter OPS.6 directly with matching valid permission for an admitted case, repeat it as facts change, stop at a blocker, or return to another current pattern.

OPS.6:End

Referenced in the corpus

49 literal mentions in other sections. Read their context to establish the relation.