OPS.23:5.2 - One workplace can need the same connection
A technician has a finished repair and wants to begin the next. Under the stated working conditions, the recipient can use the repair only after an acceptance test, and the test fixture will be free in the afternoon. Preparing the required test input now can advance the accepted result more than beginning another repair. If that preparation is already complete, a permissible independent task can proceed instead. Relate the local choice to the missing contribution and current permissions.
If the recipient cancels the afternoon acceptance window, the technically finished repair remains finished. Check which other acceptance windows are permitted before the promised deadline. Use an available window under the existing terms when it preserves the promise. If that is impossible, report the risk and obtain the authorized decision on any proposed change. Apply a change already provided for by the terms when its condition occurs. The work done so far remains available.