OPS.23:4 - Solution
Use this mantra to connect the work of a person, team or other contributor to what the operation can deliver. Follow a local action through to the result its recipient can use. The short form is:
Result needed and what counts as obtaining it → route and readiness → limiting conditions → release and feasible order → service, money and human conditions → observed result and changed conditions.
For a proposal, identify the result and the conditions that would justify accepting it. For a report on a past delivery, establish what was delivered and, when acceptance matters, whether the agreed acceptance took effect. The remaining questions connect those results to the means and evidence needed for this decision. Start wherever a missing answer could change the present decision or its grounds, and use adequate answers already available. OPS.Reference:8–OPS.Reference:11 explains the connections with other operating methods.
Relate local work to a result the recipient can use. Identify the operating system, required result, acceptance boundary and commitments through OPS.1 and OPS.3. Follow the work and its required inputs through the relevant workstations or contributors. Locate the local contribution in that route: producing an intermediate item, making later work ready, handling a return or preserving service can affect the whole differently. A completed local task is useful on this account when the receiving work can use its contribution. OPS.11.1 develops the connection between local routes, shared resources and order-level completion. When the route or work unit is itself missing, its :4.2a constructs operating alternatives from the required result and available professional methods; an unavailable method returns to its subject discipline. The judgement can therefore begin before an adequate operating arrangement exists. When the required system or its intended use remains unclear, FPF A.1.STM supplies the connected system-thinking questions; an operating calculation cannot settle that earlier choice by itself.
Find which condition limits the result under the present demand. Work can wait because an input or permission is missing, because usable capacity is insufficient, or because the selected order delays a needed completion. OPS.8 and OPS.9 distinguish these causes; OPS.10 qualifies capacity over the relevant interval. Improving an already non-limiting station can increase intermediate inventory without increasing accepted output. Conversely, protecting the limiting station may require work elsewhere. The target matters: shortening the time to a first accepted result and increasing sustained output can require different changes, as OPS.9:5.4 explains. To identify the constraint, relate the queue or occupied resource to the result being limited.
Choose starts and order from those conditions. Use OPS.2 to select the relevant management view, OPS.8 for release and queue rules, and OPS.10.2 when a deadline needs a feasible schedule. Count waiting from the recipient’s relevant starting event; moving an incomplete item off a board does not remove that delay. Include returning work, setup and recovery where they consume the same capacity. A calculation of total required hours supplies a necessary bound, while precedence and simultaneous resource requirements can still prevent a schedule. Priorities need the decision’s supported consequences and available authority. OPS.14 compares financial consequences on a common basis; its indivisible-job case shows why a value-per-hour ranking need not select the best feasible set. An unknown monetary estimate does not establish that work has no value.
Require the combined promise to be feasible. The whole-combination conditions in OPS.Reference:10 apply to continuing service and the proposed change together. OPS.12 preserves the affected people’s required conditions, OPS.13:4.3 derives the demand from what recipients may request and checks whether the available performers can respond by each deadline with the information they will have then, and OPS.14 checks payments when they fall due. OPS.19 reconciles conflicts that otherwise valid local decisions leave unresolved. PumpWorks in OPS.19:5.1 shows the consequence: two test completions and a possible repeat exhaust the same six rig-hours, so a separately feasible Method trial cannot also use that interval. Qualified relief, incident coverage and funding remain separate conditions even if more rig access can be obtained.
Return observations to the answers they change. OPS.15 keeps the observed result and its population clear; OPS.18 distinguishes containment, correction and evidence about recurrence. If a constraint moves, a return consumes a reserve or an input becomes unavailable, reconsider the starts, commitments and resource choices that relied on the earlier condition. Keep unrelated valid results. A change to the way of working uses OPS.16 with its own trial conditions, including coexistence with continuing service. If the work extends to development for further problems, use FPF C.40.OD to establish its purpose and means. The operating account supplies the conditions that undertaking must meet.
The same reasoning applies at a workplace and across an organization. Within the authority already given, a contributor can revise a local choice from the shared operating facts. A change to a commitment, resource allocation or protected condition outside that authority goes to the party entitled to decide it.
OPS.23:4.1 - Assemble the decision and select its next useful question
Keep the receiving result, proposed action and the conditions on which their connection depends in the same account. For each consequential claim, distinguish an observed fact, a justified forecast, an authorized commitment and an unresolved condition. A promised specialist is not the same as an available specialist; a planned acceptance is not an accepted result. Use OPS.4 and OPS.15 when recovering these facts is the difficulty.
Follow a suspected mismatch in both directions. If a test may finish late, identify the input, resource window or ordering constraint that could explain the delay and the accepted promise that depends on the test. If a promise changes, trace it back to the work and provision it requires. Use the relevant method or its available result to establish whether the promise can stand, what supports that conclusion and whether a change needs a decision from the party responsible.
A current sufficient answer closes the question. Otherwise choose the next inquiry, coordination or permitted operating action by what its result could change about the choice or its grounds. If a fact or decision is still missing, identify the work it limits. Independent work can proceed when its conditions and authority are established.
A plausible mismatch is enough to select this Method. Reliance on a schedule, service promise, causal diagnosis or protected human condition needs the corresponding qualified result.