OPS.19:4.7 - Return the cross-scale operating decision
Determine which conclusion the evidence and authority support for the requested work.
- Cross-scale reconfiguration. Change which Work starts or is held, or change allocation, sequence, support, or another operating relation so the material results can coexist under current authority and conditions.
- Bounded continuation. Keep the current arrangement for a named scope and interval when its consequences and protections justify doing so. A proposed change may consume a protected reserve or offer no justified improvement.
- Infeasibility or a justified refusal. When the agreed protections and available means exclude every permitted arrangement, return that conclusion with the reason. An effective refusal can close a new request. For an existing obligation, determine any notice, remedy or authorized revision still due.
- Unresolved conflict. If a needed fact, choice or authority is open, name it, its consequences and any work that can already proceed.
Record the supported outcome, its conditions, preserved results and what would reopen it. Identify any deferred demand and who is responsible for a remaining decision. Do not infer implementation, later effectiveness, a changed Method, or cultural continuation from the decision.
Send the result to OPS.16 when trial feasibility or a protected trial condition relies on it. Send it to OPS.20 only as a candidate practice variation or consequence; that Method independently supports its population, predicate and continuation decision. Any selected intervention, needed authority or claimed later observation keeps its own basis.