Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:40:20 UTC

OPS.19:4.5 - Construct materially different operating alternatives

Compare the materially different arrangements already available, including the present arrangement and its limits. If they leave a material need, condition or conflict unresolved, try changing an allocation, sequence, start condition or service boundary to construct a practicable alternative. Check the resources, commitments, authority and protections it needs. Compare continuation, deferment, a hold or stopping where they have different consequences. If no feasible alternative can be found, state what excludes the options or which condition remains open.

For every alternative, expose where it moves delay, burden, evidence risk, cash need, service exposure, quality risk, or recovery cost. Ask which participant or operating scope receives that moved consequence and whether the required condition or authority is current there.

Preserve protected conditions before seeking a local gain. An alternative that requires unavailable access, unsupported overtime, missing clinical authority, consumed incident margin, or evidence from the wrong configuration is not yet feasible. Identify whether a condition is known to fail or still lacks evidence. A known incompatibility may rule out the alternative or, when it applies across the full range, the requested combination.