Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 23:15:20 UTC

OPS.16:4.4 - Plan new trial Work when needed

For a commissioned trial, plan the agreed work under its operating conditions. If a smaller trial would suffice for the decision, check whether it also fulfils the order or whether those responsible agree to revise it. When the extent of inquiry is yours to choose, plan the smallest trial that can supply the needed grounds. Name the intended tasks, proposed performers, Method or Method family expected for each task, supports, protected conditions, observations, burdens, stop rules, hand-back and later uses. A separate observation or test can use its own Method. Identify a constituent of the proposed way when its composition matters and is established. Keep this WorkPlan prospective and identify the interval during which its premises must remain current. Existing Work is examined from its actual evidence and any plan available for it; do not write a retrospective intention as though it preceded the Work.

A compact plan can use these positions:

PositionWhat to state
status-preserved subjectExact admitted Method and relied-on description, or exact candidate account and its missing admission basis
operating questionCurrent use, proposed change, comparison, decision maker, and observation needed to decide or support the choice
intended WorkTasks, proposed performers, expected Method or Method family for each task, containing System and temporal window
conditions and stopsAuthority, permission, support, service, recovery, human protection, fallback, and hand-back
observationsDirect subjects, measures or descriptions, collection point, burden, and later receiving use
returnSupported decision branches, limits on stronger uses, and any still-needed observation or revision condition

A.15.2 governs this prospective WorkPlan; section 4.5 establishes what actually occurred.