Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:45:17 UTC

OPS.11.1:4.6 - Obtain and interpret the operating alternatives

Translate the recovered conditions into a form from which the requested result can be obtained. MMP.10 constructs constraints; OPS.10 selects the service and capacity question. Use a hand calculation when it suffices, or choose a computational procedure under C.29.2 and the relevant CMP methods.

Check the obtained alternative against the operating arrangement. Are the required performers, equipment and other resources available in the proposed intervals? Are the receiving inputs available together? Does the calculated completion make the result usable, or can the arrangement sustain the required service condition throughout its interval? A schedule can satisfy a mistaken model, so successful computation alone does not settle these questions.

For a comparison across scales, return the local change and its wider consequence together. Explain where a delay, burden or unfinished obligation moves. Use OPS.14 when financial consequences bear on the comparison or its grounds. Interpret each quantity for its period and use.

Stop with a sufficient comparison or the missing contribution that prevents one. Retain the assumptions a recipient needs to use the result. When routing, resources, calendars or acceptance changes, revise the affected account and propagate the change through the relationships that consumed it.