OPS.11.1:4.1 - Fix the receiving result and the proposed change
State what the recipient must obtain and which event or continuing condition makes it available. For an order, this may require accepted components, transport and permission to use the result. For a machine service, it may be restored operation. An incident service can instead require qualified response to remain obtainable throughout a covered interval. Use the completion or service condition of the present or proposed operation and keep any proposed change to that condition explicit.
When comparing a change, name the alternative under consideration: another release time, a different allocation, a larger transfer batch, changed routing or another operating method. Identify the quantities that would make the alternative preferable and any conditions it must preserve. When no adequate arrangement has yet been proposed, construct alternatives through :4.2a from the result, available methods and missing contributions. OPS.1 supplies the operating focus and OPS.19 the wider reconciliation when several results govern the choice.
Retain the difference between a fixed input and a decision variable. An applicable two-day supplier commitment settles the answer about the contractual deadline. Use fulfilment as an explicit assumption for a conditional schedule. A promise of timely operation also needs grounds that the supply can be made under the conditions the decision covers. If the proposal changes how that contractor is used, recover the response to that change rather than assuming the same turnaround.