OPS.11.1:2 - Problem

Descriptions at different scopes can each look reasonable while making incompatible assumptions about the same operation. A resource appears once in each departmental plan and is then treated as two resources. An internal exit becomes the completion event of an external service, although acceptance still takes time. Several samples are aggregated to one order without retaining which sample prevents delivery.

A desired service can also lack an adequate operating arrangement. A deadline names the result but leaves open how work should be divided, prepared and provided. Comparing only schedules for the existing route can miss a useful change to that route; drawing a different route can hide the technical method or provision that it still needs.

Adding detail everywhere makes the account harder to build, interpret and maintain. Keeping only totals can erase the dependence that matters. The practitioner needs a way to construct an attainable arrangement and retain its consequential dependencies while leaving irrelevant detail out.