OPS.10:0 - Use This When

Use this Method when demand, a proposed commitment, a queue policy or a resource change requires an answer about what the operation can support. Average utilization may look acceptable even though a deadline, skill requirement or protected service class cannot be met.

The first useful result is a capacity-and-service comparison for the actual demand, resource arrangement and horizon. It states usable resource time, required load, relevant variation, feasible alternatives, supported service consequences and uncertainty. It can establish a feasible option, a bound that settles the question, or a specific missing input.

Use an adequate existing result. When calculation is needed, start with a simple load/time bound and add the analysis the service question requires. Use OPS.9 when the limiting mechanism is itself unresolved. Use OPS.5 for an individual admission decision under an adequate capacity basis. A clinical staffing rule, engineering capability, labor condition or financial authorization is supplied by its own qualified practice.

When the needed calculation is missing, OPS.10.1 - Construct and Compare Operating Capacity Models develops finite, mean or probabilistic service consequences from the operating conditions. OPS.10.2 - Construct and Revise a Feasible Deadline Schedule develops resource sequencing, calendar placement and conditional time reserve for a finite delivery. Reuse an adequate calculation without repeating these constructions.