OPS.10.2:1 - Problem frame

Use this when particular work must deliver particular results by particular times, but a list of tasks and estimated durations does not establish whether the work fits. Two ready tasks compete for one specialist. A test needs an uninterrupted window. A delayed input changes which remaining operation can now postpone delivery.

Determine whether the required operations can fit their time and resource conditions. A feasible schedule shows how to meet the deadline. A sufficient bound or complete search can show that no such schedule exists. If neither result is available, state what is still unresolved. For a feasible plan, determine which delays it can absorb. Reconsider affected results when a condition changes.

First useful move. Name the recipient’s completion event and deadline. Trace the remaining operations to that event, including required handovers and acceptance. Identify the performers, equipment and calendar windows shared by the operations. OPS.11.1 supplies that operating account; OPS.15.1 supplies event and clock interpretation.

Practical gain. The planner can state what should start when, which reservations matter, how much postponement is still possible under the chosen arrangement, and what change could recover a threatened commitment.

This method addresses finite delivery timing within the broader capacity and service question of OPS.10. Its subject is the proposed schedule, not the performed work or a new customer promise. Use an adequate existing schedule directly when its conditions still answer the question. Use OPS.10’s demand and capacity analysis when the question instead concerns sustained throughput or a distribution of future delays.

The elementary cases need time intervals, arithmetic and a dependency diagram or equivalent list. A large search may need a scheduling specialist. For known jobs and durations, a deterministic calculation can answer the finite scheduling question.