OCE.Reference:14 - Pattern selection and result relations
| Working question | Start or continue with | First returned result | Main return or continuation |
|---|---|---|---|
| Which organization are we creating or changing, and which product uses and contributions govern that decision? | OCE.1 | Bounded organization-change focus, including the relevant obligations and local completion | OCE.2, OCE.3, or the direct owner of a non-OCE question |
| What Work and relations obtain now? | OCE.2 | Grounded account of the relevant work and relations, or a specific gap | Use a sufficient account directly. For a new concept use OCE.3. Seek missing evidence or an enabling relation from its source or holder. |
| Which materially different organization concepts deserve comparison? | OCE.3 | Concepts compared for the stated use, with the decision if the recipient commissioned one | OCE.4, conditional OCE.5, OCE.7, or OCE.8 |
| Which contribution paths and specialization boundaries should guide design? | OCE.4 | Proposed contribution paths, boundaries and relations, with the conditions and authority needed to put them into effect | OCE.5, OCE.7, OCE.9 for realization, or the owner of the needed relation |
| Does a stable institutional position need to exist? | OCE.5 | Position identity and establishment/continuation result, or direct-arrangement return | OCE.6 or the applicable institutional owner |
| Which assignments and enabling relations obtain? | OCE.6 | Predicate-specific effective relations and exact gaps | OCE.9 for realization, ADM.2, or the relation owner |
| How should product/service and organization architectures constrain each other? | OCE.7 | Which existing arrangements to retain or change and how the decisions fit together | product/service owner, OCE.9 for realization, or continuing Operations |
| Which complete work arrangement can produce the same bounded result? | OCE.8 | Comparison of arrangements for the required result. A reasoned recommendation can complete an advisory commission. Where a decision or trial is due, identify the actions and authority it requires | Obtain the needed capability, assignment, provider, safety/domain, or Operations result from its owner. Use OCE.9 to realize missing conditions; dependent trial Work still needs its own authorization. |
| How can the selected organization contribution become usable? | OCE.9 | Bounded capability increment or exact failed/unrealized condition | OCE.6, OCE.10, OCE.11 or LDR.1; the receiving operation or the owner of the needed result |
| Which response can repair this participation or working-culture gap? | OCE.10 | Supported response and bounded consequences when performed, or an unresolved competing explanation or gap; no new contrast when the current response is sufficiently supported across rivals | direct relation/learning owner; OCE.9, OCE.11 or LDR.1 where its result is needed |
| How can change and continuing service coexist? | OCE.11 | Proposed arrangements for continuing service during change, with their limits. For an implementation commission, establish the authorized overlap, actual consequences and any hand-back, deferral or stop | current C.32.MWA.PP, OPS.5–OPS.7, OCE.8 or OCE.16, or the owner of the needed service or protection result |
| How can capability preparation lead to actual receiving work in an organizational transition? | OCE.18 | A jointly feasible preparation, receiving-work and continuation arrangement, or its precise missing condition | qualified HCD provider, OCE.6, OCE.9 and OCE.11, owner of the work or appointment |
| Which leadership contribution is missing or dependent on one initiator? | LDR.1 | Performed contribution and tested continuation arrangement, or exact support gap | qualified learning provider, OCE.10 and OCE.11, assignment or authority owner or the direct Method owner |
| What changed, for whom and under which conditions? | OCE.13 | Qualified comparison, including any conflicting results, material uncertainty or competing explanations, or an observation plan where evidence is missing | Return the finding. Use OCE.14, OCE.10 or OCE.11 for a required revision, participation or service decision. Use applicable professional evidence or state the specific gap that limits the comparison. |
| Which organization relation should now be retained, repaired, replaced, reversed, stopped or investigated? | OCE.14 | Authorized disposition with effective scope, losses and remaining work; otherwise a proposal or authority request | OCE.6, OCE.9–OCE.11 and LDR.1, later OCE.13, and OCE.16 only for an actual cross-change consumer |
| Which organization-change Methods are usable and worth developing? | OCE.15 | Named-use repertoire or domain candidate account | Method Engineering and the exact missing OCE result owner |
| Which other changes depend on this organizational condition, and can they obtain the required result together? | OCE.16 | A qualified question or finding showing what each affected change can rely on and what remains open, returned to the recipient entitled to use it | C.32.MWA.PP, C.32.MWA, the applicable OCE/OPS/A.15 Method, or the specialist responsible for the needed decision or result |
| Which OCE practice continues across practitioners and work settings? | OCE.17 | Scoped continuation account, a retained practice variant, permitted intervention, or specific return, with later observation or a named gap | OCE.15/Method Engineering for a reusable-Method problem; applicable HCD or direct opportunity, authority and evidence owners |
Choose the next pattern from the result needed, not from a presumed lifecycle. OCE.13 and OCE.14 can use a direct result without repeating a wider evaluation; OCE.17 can support retaining useful practice without a new intervention.