Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

OCE.9:7 - Conformance Checklist

  • The arrangement reaches the required contribution and receiving use over the promised conditions, including any required response to exceptions. An adequate current whole result is reused; additional realization answers a named remaining claim and warrants its full burden.
  • The participants can distinguish selected design, effective conditions, performed attempt and capability conclusion.
  • Missing assignment, access, authority, learning, service or protection results stop their dependent action.
  • When adequate separate actions fail to form the intended contribution, the needed constituent/encompassing connection and the supported repair are explained.
  • The account states the failures, repairs or assistance observed and the conditions on later use.
  • The conclusion states its configuration, work family, window, support and limits; stronger reliance has its own evidence.
  • Local acceptance closes the agreed capability contribution at its supported scope, with future-use assumptions and continuing obligations handed to their responsible participants. Earlier evidence can support an expectation of future use. A claim that the product was used requires evidence of the later use.
  • The receiving operation has an explicit hand-back or a named remaining gap.