OCE.9:4.6 - Return a bounded capability result and usable hand-back

State the contribution now supported, configuration, participants or qualified substitutions, work family, observed window, retained support, failures, limits and next reconsideration. For a change that depends on service or support commitments, identify the applicable acceptance or seek it from the authorized operating owner.

Close the organization-change project against its agreed local result and acceptance conditions. The contractor can finish the supported capability contribution before the products it will help create enter future use. Carry the relevant use assumptions, accepted risks, continuing obligations and the participant who will act on later evidence into the receiving work. Identify evidence for the capability the contractor has undertaken to supply. The product’s acceptance and later performance require their own grounds. OCE.3:5.4 illustrates laboratory acceptance for two product lines under a stated demand range.

Where the contribution remains unsupported, report the missing condition and the action that depends on it. Identify its supplier if known. For another attempt, state the change or observation that would allow it to proceed. If no feasible way to supply the condition is known, return that limit.

Keep improvement at the right scale. A platform defect returns to its platform owner; a human target to its learning provider; a poor contribution premise to the organization decision; a recurring local norm to OCE.10. Identify any dependency between these repairs that affects their use.