OCE.9:4.1 - Select a complete, small contribution
Name the changed organization, receiving user, contribution, current arrangement and either the selected design or the duly authorized bounded attempt. Hold the acceptance basis and representative work family clear enough to recognize success and failure. If the desired result itself is disputed, return to OCE.1 or the result owner. When the OCE.8 comparison has yielded a recommendation and no decision yet authorizes action, report the missing arrangement or trial decision.
Choose a slice that reaches an actual receiving decision or useful output. “Install the repository” is a support task. “Supply a version-bound evidence package, obtain acceptance or a reasoned return, and recover a missing-source case” is a candidate organization-capability slice.
State the permitted variation, observation window, protection and recovery conditions. When the increment serves several product uses, retain the differences and joint demands that qualify its capability. A demonstration for one line does not cover a different regime or concurrent demand merely because the same equipment is used. Use an existing work note if it carries these facts.
First compare available implementation, integration or introduction results with this receiving use. A competent effort may already have established the contribution and its ordinary and exception paths, with current participants, support, protection and observation limits. If that result is sufficient and the receiving owner accepts its service consequences, use it and return the bounded result in step 4.6.
Otherwise name the organizational claim still unsupported and the first additional action or relation that could settle it. Compare a competent continuation of the existing implementation with the proposed remaining work here, on the same contribution, configuration, window, protection and available results. Include participant effort, preparation, retained support, learning only if selected, service displacement, exception recovery and follow-up. Where both call for the same work, use one plan and its results. Compare the attainable contribution and its full burden with the available continuation, an accepted delay or a narrower result. Use steps 4.2–4.5 for the remaining realization work. Section 5.1.2 applies this comparison to a change in support.