Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:55:15 UTC

OCE.16:7 - Conformance Checklist

  • Each change, subject, status, owner, scope, result, relevant window and any pending decision is independently identified.
  • The result identifies the alteration or proposed alteration and the work, decision or conclusion it could affect, or gives the grounds for excluding the claimed dependency.
  • Participant accounts, facts, relations, expected consequences, proposals, interpretations, and decisions remain distinct.
  • The evidence supports the claimed dependency, its absence or the specific limit on determining it.
  • The selected Method answers the required question under the stated conditions; its result owner is identified before substantive alternatives are compared.
  • C.32.MWA.PP owns Method/candidate-account co-use, including unchanged-Method relation-only arrangements.
  • Any architecture, compatibility, approval, acceptance, priority or capacity result identifies the rule, evidence or responsible decision that establishes it.
  • The account establishes what the result or outstanding uncertainty means for each affected change. The result is usable by its commissioned recipient. Any delivery required for coordination or under a standing duty is established on its own grounds. Unaffected Work keeps its current basis.
  • The answer covers the commissioned dependency or joint transition. One interface can settle the joint decision if its result entails the answer. An incompatibility at one required interface can rule out a proposed transition while other interfaces remain open. A request to identify all dependencies requires coverage of that set.
  • Any added qualification is compared with the adequate current continuation at full common and incremental burden; its accepted gain is still attainable before the receiving window closes.