Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:45:17 UTC

OCE.16:0.1 - Working Distinctions

Name used hereMeaning
separately managed changeA proposed or actual organization change with its own subject, intended result, status, scope, owner, evidence and any pending decision. Its effects can still reach another change.
organizational conditionA contribution, assignment, authority, permission, access path, provider or support relation, information return, acceptance route, participation condition, capability condition, or other organization relation or condition that a change may alter.
consequential dependencyA relationship in which changing a condition can alter another change’s work, a permitted decision or the grounds for a conclusion in the relevant interval. Compare what the receiving work or inquiry needs with what the first change provides or could alter. Identify whether the alteration is proposed or has occurred.
participant accountA bounded report from a participant or affected System about an action, demand, consequence, or condition. Use it to locate a possible dependency, then assess any claimed contradiction on evidence about both changes. Establish authority separately if a decision is at issue.
qualified cross-change questionA question that identifies the changes, condition and period, the work, decision or conclusion that may depend on it, the relevant participants and evidence, and what is established or still needed. Identify a suitable method and supplier when a contribution is missing.
direct MethodA Method whose result answers the qualified question within its stated applicability. For example, C.32.MWA.PP compares ways of using Methods together; an appointment requires the applicable assignment Method and actual authority.
per-change returnWhat an independently established result means for each affected change. Return that account to its commissioned recipient. Actual coordination can also require timely delivery to the parties who must act on it.
direct exitA stop in OCE.16 because no consequential consumer exists, the dependency is unsupported, or the direct answer and its per-change consequences are already available.

Different project, process, case, architecture, Method, organization, and operating descriptions remain different. OCE.16 asks which work in one change uses or would use a condition altered by another.