Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:50:07 UTC

OCE.11:4.6 - Recover and hand back with explicit remaining obligations

Recover the affected service and re-establish the conditions required for restart before resuming the blocked change. Avoid charging the same recovery interval to both service restoration and planned change output. If the original arrangement no longer fits, return to the exact allocation, commitment or co-use decision.

At hand-back, establish what the receiving service owner accepts about the configuration, support, capability conditions, open obligations and next reconsideration. Identify any conditions still withheld. Retire temporary support only when its agreed consuming obligations and replacement conditions are satisfied. An open obligation may pass to a qualified replacement under its effective assignment and support; transferring that obligation and closing it are different results. The owner can accept a bounded configuration while refusing removal of support that it still needs.

For work already carried out, return the observed overlap and service consequences. The service may have recovered while the trial was deferred and its observation remains open. For a proposal, return the supported arrangement and its conditions or the specific obstacle that prevents it.