Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

NSTD.7:7 - Conformance Checklist

CheckPassing condition
CC-NSTD7-1The inspection compares what the generated account makes available with the task being assessed. Use the current recipient’s requirements for present suitability and the earlier commission for a claim about its fulfilment. For a commissioned explanation, it identifies grounds supplied by the publication or timely declared preparation, decisions left to the reader and any necessary connection the reviewer had to supply. For a rendering of specified source material it checks the required correspondence.
CC-NSTD7-2Candidate evaluation can inform use, repair or rejection. C.35 is selected only for a result entering architecture work.
CC-NSTD7-3Source plan, plot or event plan, schema constraints, and generation method are named when relied on.
CC-NSTD7-4Fluency, coherence, controllability, schema validity and planning have criteria appropriate to those properties. Claims about evidence, authorization or admission have their own grounds.
CC-NSTD7-5For a claim about responsibility, establish who owes the stated action to whom. For a claim about permission, establish who is authorized and on what terms. One provision can support both conclusions when it assigns both.
CC-NSTD7-6An improvement claim identifies the compared versions or changed part and is supported by NSTD.6 re-evaluation, with relevant costs, risks and protected qualities considered. An already-scoped one-off comparison can be sufficient; E.22 frames an unresolved improvement question and E.23 supports repeated improvement.