MNT.Reference:6 - Applying and checking the whole language

Start with what the recipient must decide, obtain or do. For a decision about taking equipment out of service, trace the service to the parts, connections and standby arrangements that could change the answer. At each scale, keep the distinctions the recipient needs. If two installations look alike in the model but only one can continue serving its users during an outage, establish which configuration will be used, retain the distinguishing connection, or find a bound that settles the decision for both. A qualified result for the whole service can already suffice.

Follow the relations the conclusion requires. For simultaneous service, establish which unit states and loads can occur together. For successive operations, establish what the first leaves available to the next. For a rule covering alternative operating conditions, establish that the conditions cover the required cases and that the rule gives a warranted answer in each. An aggregate measure can settle a service-wide threshold while concealing a shortage at a particular outlet.

For a proposed admission rule, specify who can authorize intervention, the information available before they decide, and how admitting a job will preserve the service owed while other permitted jobs are in progress. A qualified rule can admit work conditionally before particular jobs or resources have been assigned. If users already have a right to start under specified conditions, show how the rule honors that right as well as protecting service. A rule that defers every job cannot meet a promise of access to maintenance.

When the question concerns the organization of the maintenance work, identify the operations the Method requires and who can perform them. For an account of a particular job, establish which performances belonged to it. A supplier’s earlier inspection can provide applicable evidence even when that inspection was outside the job. Use sufficient existing grounds for a recommendation. To return equipment to operation, establish the required protection, functioning and permission.

When using the framework, avoid reading the Parts as stages, treating a closed work order as restored service, taking a prediction score as maintenance value and mistaking a published Method for its adoption. The relevant corrections are embedded in MNT.6, MNT.9–MNT.11, MNT.14 and MNT.16.