MNT.7:7 - Conformance Checklist
Does the arrangement consume a valid operating-capacity and service result? Are preparation, protected work, testing, restoration and material contingency accounted for without double counting? Are overlaps compatible with actual resources and protection? Does the result establish fit for the proposed timing, a guarantee over the promised conditions or an exclusion covering every allowed arrangement? Is a required response to a change both available and authorized before its deadline?
A coordination result is complete when those responsible can act on its bounded arrangement or know the unmet condition.