MNT.15:10 - Architectural Rationale
MNT.7 coordinates an intervention with continuing operation; this Method tests the shared conditions that govern whether several commitments can be met together. It reuses general cross-structure synthesis when explaining the conflict requires more than the shared timing or resource bound.
The two jobs need eight specialist hours and the window provides six. A more elaborate optimizer is justified by an unresolved decision, not by the existence of several jobs.