Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

MNT.11:1 - Problem frame

Use this method to plan the return to operation, establish whether control has passed, or conduct the hand-back. At the end of maintenance, restrictions, a changed configuration or the release authority can affect which use is permitted.

For a proposed return, determine which configuration, evidence, authority and event would permit the intended use. To conduct the hand-back, reconcile the evidence with the actual state, obtain any required certification and carry out the transfer. To report a past hand-back, establish which transfer and permission took effect. The result can be unrestricted use, supported restricted use or the missing condition preventing that use. An adequate maintenance recommendation can be issued before hand-back.