Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

MKT.Application:3.1 - Keep the programme’s unit and result stable

Use MKT.14’s case of Sever, Vector and Luch. There are three organisations and four opportunities: two can use a limited batch-file trial; two need continuous integration that is presently unavailable. The intended result for the two-week period is two supported trials plus two reasoned decisions about the missing integration. Comparing four meetings with that result would change the question.

MKT.12 asks what the programme owner must establish to decide about each opportunity. MKT.1 recovers users, decision holders, permissions and workflow. In the two integration cases, the same missing present capability has different consequences. Sever needs it during this period and receives a reasoned refusal. Luch can use a later qualified configuration and receives that recommendation and the authorisation still needed. The nine hours for qualification in MKT.14 include preparing these decisions from the engineering grounds. A question sent to engineering would leave those decisions outstanding.

MKT.6 helps the trial participants state the useful result and what they must contribute to obtain it. MKT.2 then constructs an offer and positioning against the customer’s alternatives. The common demonstration can explain a shared contribution. State explicitly that continuous integration is unavailable when explaining that demonstration.