MKT.14:4.5 - Compare the complete programme and obtain its resources

Compare alternatives against the same useful results and period. Include research, qualification, common preparation, adaptation, team learning, contacts, coordination, provision, support, exceptions, updates and closure where required. Reuse may lower one component while increasing another. Compare a shared programme with the complete individual alternative, not with an individual alternative that omits its receiving work.

Check the contributors’ available capacity and the timing of simultaneous work. Use OCE.11 to preserve continuing service while preparing or changing the programme. A total within the available hours does not establish compatible calendars, capability, access or cash. Use STR.8 for the sustaining contribution and MA.8 for dated economic flows, shared resources and obligations.

Select a complete, supported programme by the recipient’s criterion. A smaller programme can be preferable when it preserves the agreed result and avoids unnecessary work. If the recipient seeks better coverage or greater value, compare the qualified programmes on that basis. When an option would change the agreed result, obtain the decision of those entitled to change it.

Use existing commitments within their scope and obtain any further resource or contributor decision from the party entitled to make it. A calculated proposal remains a proposal until those conditions hold. Return precisely which part can start and which part depends on an unresolved contribution.