Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

MDPE.3:5 - Checks and Common Repairs

CheckFailure it preventsRepair
Performing work and boundaryA broad project label is treated as one performing System.Name the occurrence or work family and identify the whole that supplied the relevant joint performance, or specify the organization required in a design.
Constituents and external enablers stay distinctEvery venue, service, audience, or platform becomes a part.For an existing setup, identify the established part relations. For a design, specify the required composition. Identify external interactions in either case.
Views fit their questionsFunction, construction, timing, control and placement are forced into the same hierarchy.Use a view for each relevant relation and establish correspondences where the claim depends on them.
Configuration and descriptionA score, stage plot or approval is treated as proof of an operating arrangement.State what the description specifies. For an actual realization, identify the participating resources, obtaining relations and their evidence.
Interface wording is recoveredA line or noun hides the load-bearing relation.Identify the connector, port, protocol description, signal, representation, or direct interaction meant.
Timing is groundedA count, timestamp or onset is used to stand for another timing relation.Identify the relevant continuing process, articulation, cue or perception and the evidence for its timing.
Joint coordinationComponent success is extended to a whole without support.Use evidence of the joint operation to report it. For a plan, state how the required relation would work. Seek a further test where it can resolve a consequential uncertainty.
Correction and safe stop are explicitReadiness assumes a perfect run.Identify the sensing, feedback, recovery, refusal or stopping conditions required for the particular work. Distinguish a planned fallback from a correction or stop that occurred.
Performing and decidingA robot, platform, controller or conductor is given decision authority solely because it produces a signal.Identify who performed the work and who held authority for the relevant choice. For an actual decision, determine what was chosen.