| Starting the change | Which choice selected the change? At execution time, do the authority, permission, performer, subject and other required conditions cover the work? For a past change, use the conditions at the time. |
| Testing the change | A small trial can limit burden and risk. Check what it can establish about the intended performance. |
| Direct result vs wider effect | Immediate results can often be observed; performer, audience, event, and cultural effects need separate relations and evidence. |
| Changing and preserving | Identify the changes sought and the identity, safety, consent, source access or alternatives the decision protects. |
| Counting work | Selection, planning, performance, transformation and evaluation can appear in one project. Identify which actually occurred, which results they produced and whether the same work served two purposes. |
| Local and wider use | A local organizer can change its arrangement. Claims about other practitioners or a larger culture depend on their actions and circumstances. |
| A partial attempt | Report what the evidence establishes about a failed or incomplete attempt. It may be the result a later practitioner needs. |