LDR.2:4.7 - Return the agreement to work and respond to a changed contribution
Give the receiving practitioners the accepted conditions and unresolved matters. Product and organization decisions may need coordination through OCE.7; engineering architecture and whole-result alternatives use SYSE.6 and SYSE.24; an existing promise may need an authorized response through OPS.13. For work in another domain, use the relevant professional methods. If a decision is needed, obtain it from the party authorized to make it.
For an order to reach agreement, return the feasible terms accepted by those whose assent they require, with any condition still to be met. If the order includes an effective start or delivery, obtain the acts that put it into effect and carry the contributions through to their receivers. LDR.4 helps arrange the first handover.
Agree a practical response to foreseeable changes: who reports the loss, who can supply a substitute, which participants reconsider dependent terms and how an existing promise is handled. When support disappears, identify the contributions depending on it. Check which substitutes, dates or scope the existing agreement already permits. For a change outside those terms, obtain the decision or renewed agreement needed from those entitled to make it.
Preserve unaffected results and commitments. A withdrawn support offer does not erase a valid test result. A failed proposed arrangement does not automatically cancel an existing obligation. If no feasible accepted alternative remains, return that impasse to the responsible decision makers before the unsupported work is relied on.