Jump to text
On this page
Copy and source
Original source · lines 7–32
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

Table of Contents

Start with the Readme for an ordinary working situation, or the Implementation Facilitation Principles Framework Architectural Reference for the connected practice. The index locates the complete Methods.

The seven local Methods use the reference code IS. The Core row links to the general Method for introducing a practice. The § column gives publication order. Start with the contribution your work needs. An existing result can meet a dependency when it satisfies the conditions in the Method.

§ID & TitleStatusKeywords & Search QueriesDependencies
1IS.1 - Agree a Useful Implementation-Support UndertakingStableWhat help is wanted, permitted and obtainable? Who expects which result?Receiving work and actual parties; OCE.6, LDR.4 or MKT.11 when effective arrangements, a prepared decision or a service promise must be obtained.
2IS.2 - Find the Implementation Difficulty and Obtain the Next Useful ContributionStableWhat makes the intended use difficult? What does the evidence establish about a past or proposed use? Which contribution is missing, if any?IS.1 undertaking or a qualified equivalent; observed episodes or a stated prospective case, and relevant subject expertise; HCD.3, OCE.10 or RMP under their own conditions.
3IS.3 - Construct and Adapt a Support Strategy with Its RecipientsStableWhich help fits this work? Can the proposed arrangement supply it, or does the existing service already suffice?IS.1/2 values or qualified equivalents; C.32.MWA.PP configuration comparison and A.15.8.MS method-use support; HCD, OCE and C.32.MWA where their contributions are needed.
CoreFPF A.3.1.MI - Introduce a Method into Practice and Decide What to Keep or ChangeStableWhat happened during introduction or later use? Does that evidence warrant a change to the target, strategy, conditions or claim?Qualified target and strategy accounts; actual permissions and support; A.3.2.DE / A.15.8.MS / A.3.1.FT / A.3.1.MV; FPF Method, Work and evidence governors; capability or causal branches only when relied on.
4IS.5 - Sustain, Transfer, Extend or End Implementation SupportStableWhat remains needed when help, recipients or conditions change? Can support end or transfer?Continued-use question and A.3.1.MI or equivalent evidence; actual providers; OCE.11, HCD.15, CB.14 or C.36.RP under their own conditions.
5IS.6 - Broker a Practice Change Across Unequal InfluenceStableWhose contribution has too little influence on the change? Who can consider it or act on it?IS.1–3/5 and A.3.1.MI where needed; CB.15, PSDA.12 and PSDA.13 and OCE.6/10; CB.16 only for actual collective representation.
6IS.7 - Facilitate a Practice Change with Its Participants and ContextStableHow do the practice, its participants and the setting affect the result? If a change would help, who can make it?IS.3, A.3.1.MI, C.40.JD, C.32.MWA.PP, A.15.8.MS; subject judgement, HCD/OCE and IS.6 under their conditions.
7IS.8 - Develop Recipients’ Ability to Facilitate Further Practice ChangesStableWhat can recipients do in the next change, with which retained assistance?IS.5/6/7; HCD.1/3/9/12/15, OCE.9/11/18, E.23.CDI and C.40.NP.

Architectural account: field and connections; receiving use; target and help; Method connections; performers and provision; supported conclusions; sources and limits.

Supporting returns: external contributions; source reach; changed conditions; evaluation; current source questions; edition and use.

For a connected worked use, see the Harbor Design application. For the public supplying frameworks and the questions they answer, use IS.Reference:1. The same short names occur beside the actions that consume their results.

Further architectural and source sections: IS.Reference:11 - Supplier availability and independent changes; Implementation Facilitation Principles Framework Sources and Edition Notes.