IS.3:5.1 - Compare complete first-week alternatives
In this constructed Harbor Design case the following quantities are stipulated for the comparison. Six analysts are available. After the local diagnosis, suppose four have adequate current capability for the selected case family and two need a supported attempt with feedback. The intended first-week contribution is eight eligible package checks, with the two additional analysts beginning to acquire the missing comparison operation. In the current continuation, the four capable analysts can provide those eight checks at 0.20 hours each, using 1.6 hours already available for checking. The two analysts’ acquisition requires additional work.
All three serious alternatives require the same access repair, taking 1.5 technical hours, and a 0.5-hour managerial contribution that makes the review interval and receiving decision effective. These two hours are counted once in each alternative.
| First-week alternative | Scarce qualified provider time | Other direct time, including ordinary checking | Complete effort for the selected work |
|---|---|---|---|
| Full six-person workshop, followed by brief individual follow-up | 2 hours preparation + 2 hours teaching + 6 × 0.25 hours follow-up = 5.5 hours | 6 × 2 hours attendance + 6 × 0.25 hours follow-up participation + 2 common hours + 1.6 hours checking = 17.1 hours | 22.6 hours |
| Targeted workplace rehearsal for the two analysts | 1 hour preparation + 2 × 0.75 hours coached rehearsal = 2.5 hours | 2 × 0.75 hours participation + 2 common hours + 1.6 hours checking = 5.1 hours | 7.6 hours |
| Qualified expert supplies the checking contribution for eight cases | 8 × 0.20 hours = 1.6 hours | 2 common hours; the expert replaces the analysts’ checking contribution | 3.6 hours |
The totals include eight checks and the implementation work in each constructed alternative. Other unchanged package work lies outside the comparison. Relative to 1.6 hours of ordinary checking, the additional effort is 21, 6 and 2 hours respectively. The workshop uses the instructor’s time and each participant’s time. In the expert option, the expert performs the checks in place of the analysts.
Suppose only three qualified support hours are available after existing commitments. The workshop is unavailable in that window. Targeted rehearsal needs 2.5 hours. Two agreed 45-minute intervals and the available preparation hour give it a workable schedule.
The expert service can supply eight immediate checks with less first-week effort than either learning arrangement in the table. If those checks are the entire requirement, the expert service is eligible alongside the current analysts wherever each can meet the receiving conditions. If the authorized promise also includes developing the two analysts’ judgement, the extra learner work and support remain necessary.
The parties select targeted rehearsal for the acquisition attempt and retain the existing qualified review condition until later performance supports another allocation. They obtain the rehearsal and assessment from HCD and the subject provider. Use A.3.1.MI to examine what happens when the strategy is introduced.