HCD.4:5.1 - Constructed Positive Case: ImpactReview-17

ImpactReview-17 is a constructed case. ImpactReview-17-Domain-Oracle-v1 supplies engineering correctness and criticality criteria for PumpWorks-Config-Baseline-42 and AI-Assist-M4. The observations and decision conditions below are stipulated case data.

The human holder is Engineer-P14. The later-Work demand is independent review of AI-proposed change-impact claims under a forty-five-minute case limit, current source/configuration access, auditable evidence, and bounded safety and maintenance specialist returns. The work permits a routine reminder to construct and test an alternative hypothesis, while the engineer must supply the case-specific rival and its test. The explicit probe prompt in HCD.3:5.1 names that operation without supplying its answer. Self-initiated recall remains a separate question. HCD.4 keeps four claim rows:

Claim in the constructed profileCurrent evidenceTarget and trade-off disposition
source/configuration trace8/8 under the stipulated configurationPreserve; do not trade traceability for speed.
independent AI-output challenge2/4 planted-error cases; both misses are unfamiliar variantsObserved gap in these cases. The proposed priority is to detect all four planted errors while still completing the trace and evidence return within forty-five minutes. Check what time is available for those actions.
bounded specialist return2/2 relevant casesPreserve the authority boundary; do not internalize specialist judgement.
auditable evidence return8/8Preserve; no aggregate may hide a missing critical-error record.

For Engineer-P14, preserve the three supported contributions. In unfamiliar cases, investigate whether the engineer generates and tests an alternative before accepting the AI’s claim. Examine the prompt and the time left for challenging the claim alongside the required audit. A usable cue or a feasible change in the arrangement may address the misses. The comparison leaves the programme choice open.

Engineer-P14 can choose a self-development focus within a separately authorized twelve-hour allocation. The constructed record shows how Engineer-P14 compares the options using C.11.

Decision valueConstructed case value
DecisionSubjectEngineer-P14.
DecisionSubjectGranularityIndividual. The allocation delegates this choice of focus to Engineer-P14. Other participants may advise.
OptionSetO1 preserve the profile without selecting a change; O2 make independent AI-output challenge the priority for later programme comparison while preserving the three supported claims; O3 defer a human profile-change priority and return the live prompt-design question to the Method/tool owner.
EvaluativeMeasurePrefer fewer accepted seeded safety-critical omissions while preserving source/configuration trace, specialist authority, auditable evidence, the forty-five-minute case limit, and reversibility.
BeliefStateTwo unfamiliar misses, a small sample, and a live prompt-design rival remain.
OutcomeModelA two-case prompt comparison can still change which of O2 or O3 survives, while differences between the cases remain unresolved. This supplies evidential input rather than an isolated causal prompt effect. O1 leaves the observed critical-error gap unchanged.
dependence layerEvidential baseline only; no causal intervention or capability-change claim is used.
ChoiceRuleChoose a profile-change priority now only if it survives the live nonhuman rivals and no feasible decision-changing probe is worth its cost; otherwise emit probe again for the smallest feasible probe that can reverse O2 versus O3 within the allocation and protected conditions.
ProbeActionSetTwo further unfamiliar seeded-error cases, with one first attempt per case: one uses a neutral prompt, the other an explicit counter-hypothesis prompt. Observe whether P14 generates and tests a rival and rejects the wrong AI claim. In each attempt also check the source and configuration trace, the specialist’s authority, the audit record and when the whole return was complete. Keep the same sources, tools, specialist routes and forty-five-minute limit per case.
ProbeBudgetTwo hours remaining for this pre-choice probe inside the twelve-hour allocation.
CostToProbeUp to ninety minutes for the two attempts, plus thirty minutes reserved for preparation and comparison: two hours in total.
value of informationIf only the reminder yields both the correct challenge and all the required returns on time, that result supports considering O3 for those conditions. If P14 can challenge only by omitting the audit or missing the deadline, the joint task remains unresolved. Misses under both prompts count toward O2 to the extent the evidence supports sufficient time and access for the full task. Interpret the comparison with the differences between the two cases still open. The seeded critical-error boundary makes this possible change in choice worth the bounded cost.
probe-worthinessFeasible and worth its cost.
ChoiceResultprobe again with this two-case comparison, one attempt per prompt condition. No profile option is selected yet.
next question and authorityReturn the new observations to HCD.3 and the updated comparison to HCD.4. The accountable manager owns time allocation, Work assignment, and employment consequences; safety and release owners retain their authority.

Engineer-P14 applies the stated rule and selects the two-case comparison under the existing time allocation. Each case receives one prompt condition, so the result must be interpreted with the unresolved differences between cases. The manager’s allocation and the separate safety, release and employment authorities remain in force.