HCD.11:5.1 - Correct arithmetic, failed compatibility, later independent performance
The following attempts by fictional Learner-L17 illustrate how to assess performance.
In this constructed engineering change service, a recommendation must meet the HW3/FW8 requirement. The supplied financial assumptions give approximate NPVs of 48.9, 51.6 and 44.6 thousand for alternatives A, B and C. B has the highest NPV, but its report covers FW7. A needs a further shared-power check. C retains HW3/FW8 and uses SCHED2, with two hours of required checks per change and one hour of preparation per homogeneous batch of at most four. The twelve incoming changes in this case share the required batch conditions. They may be grouped in fours.
With 24 test hours available, ten changes need 20 + 3 = 23 hours and twelve need 24 + 3 = 27. C supports a proposal for ten. If twelve arrive that week and ten are completed with no other exits, the queue grows by two. The release manager must agree to the limit and retains the release decision. The batch limit alone gives a minimum of three batches for ten changes. Ten changes in five incompatible pairs would require five batches and 25 hours. Before making a positive proposal, check which changes may share preparation.
The assessed contribution is to inspect configuration evidence, preserve required checks, and explain a supported continuation and its queue consequence. L17 has the reports, task tables, calculator and ordinary AI assistance; no teacher hint is permitted during an independent attempt. The assessor observes source and assistant traces and asks for an explanation only where needed to attribute the conclusion. In the two fresh cases below, the trace places L17’s recognition before any teacher or AI cue names the mismatch; ordinary tool access remains available.
| Attempt and conditions | Constructed observation | Judgement and inference |
|---|---|---|
| First attempt, no teacher cue | L17 calculates the financial ordering correctly and recommends B without noticing that the report is for FW7. | Calculation is supported. The compatibility criterion fails; the first recommendation is unsupported. |
| Same task after “Which configuration was tested?” | L17 finds FW7, withdraws B and explains A’s remaining check and C’s bounded ten-change proposal. | This attempt shows that L17 corrected the recommendation with a configuration cue. |
| Fresh representative case, ordinary means, no cue | L17 finds a mismatching report and explains why the higher financial value cannot settle compatibility; L17 proposes the supported C limit and queue return. | Independent configuration checking and bounded continuation are supported in this case. |
| Second fresh representative case, ordinary means, no cue | L17 again detects the mismatch, traces the relevant evidence and explains the 23-hour limit and how the queue would change if ten were completed with no other exits. | The specified contribution is supported across the two fresh cases, with a small-sample boundary. |
For local practice planning, retain the first miss, the helped correction and the later independent observations. The two fresh cases support the calculation and configuration contribution under their tested conditions. If a material resource change matters to a later use, use suitable existing evidence or select a further observation when its attainable result is worth the cost. A release decision remains with the release manager.