FPF.Reference:16.9.9.3 - 9.3 Test actual use and keep the structure claim separate
The collection makes the two epistemes eligible for the support use. Three separately admitted Work occurrences supply the following observations; the tailoring row’s mandatory permission/authority stop remains untested:
| Performed user Work | Direct System use and observed result | Boundary |
|---|---|---|
W-MESUP-EC417-Retrieve-1, TraceReviewer-17, 10:30–10:42 | SSUW-EC417-Retrieve-PLM-1 relates that Work to SYS-EC417-PLM-1; the user retrieves MBE-EC417-B2-1 and recovers candidate status, ATP-2, confidentiality, and the D0 stop | observation covers this retrieval task |
W-MESUP-EC417-Tailor-1, SafetyReviewer-17, 10:42–10:55 | SSUW-EC417-Tailor-CI-1 relates that Work to the non-confidential SYS-EC417-CI-1 fixture; the user preserves signed-before-closure and rejects the stale edition | the tailoring operation remains undefined and the permission/authority stop remains untested |
W-MESUP-EC417-Select-1, ReleaseDecider-17, 10:55–11:08 | SSUW-EC417-Select-PLM-1 relates that Work to SYS-EC417-PLM-1; the user distinguishes A, B2, and R and applies the named B2 stops | observation covers the user’s branch selection in this support test |
Each SupportSystemUsedInWork@EC417 occurrence requires the independently admitted Work, one exact admitted System, an actual input/output interaction, and use of the returned value in that task. Each Work keeps its own enacted support-use Method, performer core, containing-System relation, assignment, and post-admission attribution.
RES-MESUP-EC417-B2-1 returns task-pass for retrieval and branch selection, retains the observed tailoring fixture, signed-before-closure and stale-edition results, and returns missing-task-set[tailoring-input-action-result] plus the separate missing-task-test[tailoring-permission-authority-stop] for the full tailoring task. The branch-selection stop cannot supply an observation of another user’s tailoring action. A later failed task would need its own repair and rerun Work, with the earlier histories preserved.
PSO-EC417-B2-Use-1 remains a proposed organization whose four A.22 candidate groups stay separate: identified constituents; the two membership episodes and three direct PLM/CI-use occurrences; current-edition, status, confidentiality, signed-evidence, assignment, permission, authority, reversibility, and D0 constraints; and the named support-use frame. This support account makes no selected-U.Structure claim. If a named receiving use requires one, establish the four actual A.22 values for that use from the case facts. ESA-EC417-B2-1 returns missing-selection-basis only when a value or judgement required for that use remains unresolved.
A claim of dated selection Work separately needs its selecting System, enacted Method, independently admitted Work and any claimed participation or operation binding. The observed task results and separate missing tailoring test retain their own grounds.
Keep the membership episodes and their assertion or evidence epistemes distinct from the optional construction account MBCA-EC417-B2-1, edition episteme MBE-EC417-B2-1, publication occurrence PUB-MBE-EC417-B2-1, named-use reliance episteme, proposed organization and any required selection-basis result. The bounded usability claims rest on their task observations.