FPF.Reference:16.7.2 - Several structures and several views can coexist
A Method decision may depend on a Method composition structure, a Method unfolding, simultaneous Work, an allocation structure, a subject-and-support arrangement, a description structure, or cultural relations. These structures need not be isomorphic. Name the structure and relation that changes the decision.
Project, process, and case views can expose different claims about the same Work. A project viewpoint may expose dates, allocations, authorities, and decision slots. A process viewpoint may expose recurring input/result and coordination correspondences. A case viewpoint may expose the changing evidence, exception, and next decision.