FPF.Reference:16.1 - Follow one question through several contributions

When a question, surprising result or promising construction leaves the next useful reasoning contribution unclear, use B.5. State what an answer should let its recipient understand or do. Use an available result when it answers that question. If grounds are missing, obtain the needed contribution and explain what it establishes and where it applies. Choose optional follow-up questions by the difference their answers could make and the work of investigating them. If the commission also calls for a fresh observation or an independent judgement, carry it out under the agreed terms or seek an authorized change. If no question has yet been recognized, use B.5.PI on an ordinary work occasion, such as a handover, demonstration or explanation.

Consider a constructed example. A team is deciding how to help engineers review technical reports. A purchased assistant and a locally operated assistant remain candidates. The local candidate appears faster on the small set tried so far. The current question is whether that is enough to begin relying on the proposed review arrangement.

Use C.16 to make the reported speed interpretable: which reports, which part of review, which assistance, which result, and which uncertainty does it cover? A time for extracting passages leaves open the time for checking their relevance and correcting errors. Use B.3 when the next decision needs an assurance answer: what exact claim does that trial support, what could defeat it, and which reports or operating conditions remain outside its basis? If the trial omitted reports containing tables, retain its result for the tested class and identify the table-handling limitation. That missing comparison becomes a probe proposal only when the receiving choice and attainable contribution warrant the inquiry.

The proposed arrangement also needs extraction, independent checking and final release review. Suppose their estimated weekly demand on the same engineer is respectively 3, 8 and 4 hours, while only 10 hours are available. The estimates apply to the same workload and the hours cannot be shared between these activities. Each activity fits individually; together they require 15 hours. The useful whole-arrangement result is a five-hour shortfall. Even if extraction took no time, independent checking and final release review would still take 12 hours, two more than the engineer has. To build a feasible arrangement, establish what the checking must be independent of. If the checker must be independent of the person who extracted the passages, adding five hours to that same engineer would cover total demand but leave the required reviewer missing.

B.1.5 becomes relevant if the team is also designing these contributions as one reusable Method: it asks how the part Methods, preconditions, results, order and failure handling make the whole action possible. For the present capacity question, the explicit workload and resource comparison are sufficient.

With these two candidates and the missing table-handling comparison, use C.11 when the team must decide whether another bounded probe is worth its cost before choosing. The proposed probe must be able to change that choice; the current candidate descriptions and qualified results remain available. A different question arises when the team needs a continuing research archive, a front or generation of further possibilities: C.18 then supplies that contribution. Use C.19 when the team must decide or reassess the exploration or exploitation policy for its still-live pool, such as the allocation of effort across several continuing lines. The local choice can proceed directly when neither of those broader questions is current.

The speed observation supports a claim about the report class tested. Under the stated workload, staffing and time estimates, the proposed review arrangement cannot be staffed for that workload. Even eliminating extraction would leave a two-hour weekly shortfall. This assessment rules out deployment on those terms. A change in staffing or workload can reopen the capacity question. The party with deployment authority can use the finding to decide whether to pursue a different arrangement. A comparison on reports containing tables matters for a candidate still under consideration when handling them is required.

Inquiry can stop earlier. A laboratory may need to explain why several performances differ before it has any preferred intervention. A.3.1.MR helps recover a candidate reusable way from the performance evidence; a counterexample can leave the candidate unresolved and identify what to observe next. The useful result is then a sharper hypothesis and discriminating observation. Choosing or deploying a solution becomes current only when the research question and evidence make that next move useful.