FDM.4:5 - Archetypal Grounding
FDM.4:5.1 - A payment, an instruction and a modification
Suppose 105 is due on day 30 and the borrower pays 60 to the lender. Evidence establishes the payment. Under the supplied rule all 60 applies to this obligation and no additional fees or interest arise. The remaining amount is 45.
A servicing report showing all 105 unpaid disagrees with the established position. Report the remaining 45 and the discrepancy. Retain the original contractual payment of 105 and the actual payment of 60 in their respective accounts.
Suppose the evidence instead shows only that the borrower sent an instruction for 60. That establishes submission. It leaves the payment event and reduction to 45 unresolved. If receipt is the only way the debt could have changed here, evidence of receipt or its absence can settle the residual. An adequate statement of the residual may already answer a balance inquiry while leaving the route open.
In a separate case, suppose the competent parties validly modify a lender’s conditional advance obligation before funding. The supplied terms give that modification its effect. Report the changed undertaking from the effective event even though no money has yet moved.
The results depend on the stipulated formation, modification and payment-allocation terms. Use the terms governing the particular instrument to establish its effects.
FDM.4:5.2 - Deriving the position through an interpreted calculation
Suppose the lender receives 60 under terms classifying it as refundable cash collateral. The loan obligation of 105 remains outstanding. Subtracting 60 from 105 gives 45 arithmetically. Here the appropriate account retains 105 due on the loan and identifies the separate collateral position.
By interpreting the receipt under the contract, the modeler derives its financial effect and constructs the position account. The repayment terms permit subtraction from the debt. The collateral terms require a separate collateral position. The bank receipt is the financial event interpreted in that work.
If the modeller can calculate but lacks the required interpretation, use an adequate existing interpretation or obtain one from a qualified source. Develop the modeller’s own interpretive capability if the work also requires that ability. With the terms established, use the existing evidence of receipt. If collateral can later be applied to the debt, establish the relevant event and its effect before updating the obligation.