Validated -> approved -> compliant | One label carries evidence, standard, requirement, and release status. | Split the target/result/status occurrences; add exact Bridge, interpretation relation, evaluation work, and rule only where current. |
| Approved method means SLO satisfied | Design approval becomes runtime result. | Keep MethodDescription approval, method enactment, runtime result, and clause evaluation separate. |
| Evidence status as domain result | Measured, Corroborated, or Refuted replaces measurement, proof, causal, or diagnostic result. | Recover the direct result and result episteme first; evidence status only classifies evidential standing for the named use. |
| Status defines target | A Ready or Approved row is treated as constituting a service, method, clause, person/team state, or product. | Recover target identity under its direct governor before status application. |
| Status badge or list membership as use | Display, list, or row membership is treated as source, status application, gate passage, or reliance. | Recover assertion/source and the separate actual receiving-use relation. |
| Clause-less compliance | Compliant is asserted without an exact clause, target, rule, scope, conditions, and window. | Recover the clause and direct evaluation result. |
| Bridge-free roll-up | A dashboard aggregates local labels as global synonyms. | Establish the rule by which the component results support the displayed conclusion and check its conditions. Use F.9 when a separate correspondence between local meanings is needed. |
| Bridge/family edge as explanation | A Bridge or EvidenceStatus -> RequirementStatus arrow is treated as direct reason. | Name the StatusInterpretationRelation, exact rule, evaluation application, and result. |
| Evidence escalation without independence | Two independent readings of the same temperature record are counted as two temperature observations. | Apply the rule for the proposition being corroborated. Identify the separate judgements or observation occurrences and their conditions. If a new observation is commissioned, the earlier readings can supply inputs while that performance remains due. |
| Status role for episteme | A report, standard, or requirement is said to ‘hold a role’. | Use the A.2.4 and F.10 use relations. They establish neither System admission, local system-role classification, nor an assignment. If the receiving claim needs an assignment, name the admitted System, declared assignment species and occurrence, and that System as its holder. |
| Tool-state explosion | Every local tool state becomes a durable status kind. | Keep tool labels local; create a durable cell/family mapping only for a receiving use that needs it. |