ECO.8:5.2 - Local water agreements share a wider constraint
Two canal groups allocate within their areas. Each local rule can be feasible while their combined withdrawals exceed the common supply. That joint limit can answer a question about present feasibility. If a workable arrangement is required, connect the allocations through the physical limit and a decision the parties can carry out.