EAM.8:4.2 - Construct the dated consequence account

Follow the work and use whose differences matter to the requested comparison. These can include initial preparation and integration, recurring operation and support, subsequent interventions, interruptions and temporary provision, and the intended ending. Attach each consequence to its cause and date. For an intervention, include the entire outage through the return to service. If you need to determine its duration, use MNT.7. The physical repair can take less time than the service interruption. Carry the resulting work and service conditions into EAM.11.

Determine the economic consequences at the precision the question requires. An agreed whole-service price or a bound on the difference between complete policies can settle preference without a breakdown of each cost. FIN.6 develops a dated incremental cash account: compare the proposed policy with its actual alternative, include changed operating and investment cash, and distinguish historical expenditure from future avoidable consequences. Identify the asset and configuration, receiving service, comparison perspective and date, price and discount-rate basis, relevant tax and financing treatment, and ending premise. Where the comparison relies on a financial contribution from another party, obtain the amounts, dates, assumptions and limits it needs. Use corporate-finance assumptions where they apply to the receiving case.

A recurring service price may already include maintenance, response or replacement. Check those inclusions before adding separate allowances. Conversely, a required future overhaul is still a consequence when it falls outside the current capital request. Preserve unpriced service loss, safety, environmental or other material consequences for EAM.9 instead of silently treating them as zero. A finance result values the stated policy; it does not establish that the policy can supply the service.