Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

EAM.7:4 - Solution

Recover the required outside contribution, recipients, conditions and horizon from EAM.1 and EAM.2. Identify which feature of the incumbent arrangement is an assumption rather than a requirement.

Form materially different ways to supply the contribution. Depending on the problem, these can include changing an existing asset, acquiring a new one, redistributing capability, sharing a provider, leasing a service or changing demand. A renamed supplier offering with the same relevant behavior is not a distinct architectural alternative.

Describe how each option could work. Identify the asset or provider, integration with the present arrangement, interfaces, access, support and changes to operation. Use an applicable SYSE.5 result when functional organization and bearer allocation determine the option. Obtain subject-specific engineering where physics or other specialist constraints decide feasibility.

State the realization conditions and consequences for the same required service. Include procurement and integration time, interruption, continuing cost, dependency, reversal and exit. Identify what remains uncertain, including whether a proposed interface is compatible.

Compare the set with the incumbent or a no-build response. Explain why withdrawal, demand change or another contribution is included or excluded in this case. If an option requires amending a service commitment, identify the separate decision on the amendment and whether the competent authority has made it.

Return enough materially different alternatives to support comparison under EAM.9. Stop adding options when further generation is unlikely to improve the requested answer at a worthwhile burden. For a promising option that cannot yet be used, identify the dependency that still lacks support.