Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

EAM.2:4 - Solution

State the desired outcome and its recipient. Distinguish an aspiration from an adopted objective or service obligation. Identify the required service, population, location, conditions and horizon at the grain that changes the asset decision.

Describe the contribution needed to supply that service. Use quantities and conditions where they matter: flow at the delivery point, usable storage, response time or an available operating interval. A count of installed assets is not itself that contribution.

Relate the contribution to possible assets or arrangements. One contribution can require several interacting Systems, and one asset can support several contributions. Preserve the actual dependencies instead of forcing the relationships into a one-to-one hierarchy. Use SYSE.5 when the bearer or allocation alternatives need engineering development.

Compare the needed capability with an applicable account of the present arrangement. Identify the consequential gap and its evidence. A supplied qualified result can be used directly; otherwise obtain the specific service or engineering result required. Separate a known shortfall from an uncertain forecast.

If the choice of means is open, test whether the proposed asset is needed. A different provider, a shared service, an operating change or a permitted change in demand may supply the contribution. If the commission asks whether a specified arrangement can work, evaluate it on its own terms. A decision to change those terms belongs to the party with that authority.

Return the supported relations and the next asset question. Stop when they are sufficient to generate or compare options. Reopen when the service, outcome priority or a relied-on capability changes.