Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:45:17 UTC

E.9:4.1 - Minimum decision-inspection content blocks

A nontrivial DRR must also make the following parts of the decision available for inspection. Authors may present them within the four kernel components or in a dedicated Decision grounds used or decision-inspection block. They are part of an adequate decision before it reaches a later review.

Decision-inspection content blockWhat must be recoverable by valueUsual location in the DRR
Exact decision grounds and governing inheritanceThe exact source documents, accepted architecture and audit records, and inherited decisions that govern this choice, plus any uncertainty those grounds leave open.Header or Decision grounds used, with the Problem frame or Rationale carrying the decision-relevant source use.
Purpose, utility, and scenario groundingIntended FPF use-value, first-minute working situation, minimum scenario/anti-case grounding, and compact utility/fitness reading.Problem frame.
Decision-relevant alternatives and current dispositionThe alternatives needed to explain the selected answer, a live boundary, or a reopen condition, with their current disposition. Discussion history and harmless options stay outside the current DRR; retain them in a separate historical source only when a named later use needs that history.Decision and Rationale.
Content-distribution and outside-boundary mapFor each consequential part of the answer, state what each selected locus must say, which related loci stay unchanged and what must agree across them. For a selected pattern, name the first subject kind and the action to explain. Use a consistent, compact account of exclusions and non-obligations to guide distribution. Do not paste it into the pattern Solution as negative doctrine or leave its distinctions for a later wording repair. Ordinary use/apply this pattern remains valid shorthand. In the distribution map, state the concrete claim, relation, boundary, or practitioner action that would change. Repeated content-family and reference catalogues, README/ToC/E.11 navigation, current development’s package-boundary, split/defer, and architecture-placement correspondence, and phrase-level boilerplate around simple claims stay in DRR, architecture documents, handoff, relation rows, README, ToC, E.11, or one compact local locus instead of the Solution. Publish use-changing architectural reasons under E.8:4.2.3. When proposed wording still needs precision restoration, name the pattern that supplies it: E.10, E.10.ARCH, F.18, F.19, or another governing pattern. Classify each named related locus now. Phrases such as most likely / may need / if later touched leave its disposition undecided.Decision.
Existing-pattern sufficiency and new-pattern necessityFor each load-bearing selected answer, whether an existing pattern suffices, an existing non-pattern FPF kind-reference pair suffices, or a new locus is needed. Explain why the rejected options would put the content in the wrong place, overload its governing locus, or split it unnecessarily.Decision and Rationale.
Naming, ontology, and wrong-carrier-confusion accountHead/branch/object/move/outside-work separation, tempting wrong-pattern assignment or wrong non-pattern FPF kind-reference assignment, and any load-bearing F.18 naming obligation needed to keep the selected answer truthful by value.Problem frame, Decision, and Rationale.
Reusable content-disposition when triggeredWhether a potentially reusable selected non-pattern FPF kind-reference pair remains local, is generalized now, is rejected, or is placed outside the current decision with named pattern, selected non-pattern FPF kind-reference pair, or decision record.Decision and Rationale.
Loss and recoverability template when source-loss or scope narrowing is declaredPreserved distinctions, dropped distinctions, admissible use, non-admissible downstream use, recoverability class, and reopen/stop rule.Decision and Consequences.
Selected locus and related-pattern boundary accountWhy the selected loci carry the content, which tempting selected loci stay outside, and which patterns govern the claims, relations, or boundaries left outside.Decision and Rationale.
Convergence and overlap account when several content-decision branches touch the same carrier setWhether overlap is valid convergence or an architecture problem requiring reconsideration, what agreement across selected loci must hold, and whether the decision selects or refuses a new pattern or selected non-pattern FPF kind-reference pair.Decision and Consequences.
Selected-answer stability boundaryWhich elements of the selected answer are fixed now for later FPF drafting, and which later elaborations may strengthen wording, examples, source-use rows, or validation evidence without reopening the selected answer.Decision and Consequences.
Impact, practical gains, and remaining validation evidence obligationAffected patterns and selected non-pattern FPF kind-reference pairs, practical gains/costs, authority or release consequences when they follow from the content decision, and the remaining validation evidence obligation that constrains later authoring or landing.Consequences.
SoTA and competitive-positioning account when load-bearingCurrent best-known problem-solving source anchors and source-derived moves under E.8 that discipline the decision, what problem-owning domain or practice they answer to, which official, popular, or legacy alternatives they reject or bound when relevant, and what unresolved uncertainty would materially change the selected answer.Problem frame, Rationale, and Consequences.
Actual-host predecessor/proposed replay when a broad authoring rule is selectedOne dependency-aware real host comparison at comparable effort: recognizable entry, inputs, first action, vocabulary, formality and assurance burden, first useful result, stop or return, preserved useful ideas, and direct consumers. Use E.8 and F.19 on the proposed wording. For a wider conclusion, explain which conditions of this comparison carry to the other promised uses and what grounds that inference.Decision and Rationale, with the selected rule and pilot effect carried into the locus obligations.
Campaign problem-solution unfolding carry-through when triggeredFor campaigns changing README entries, path-shaped patterns, pattern families, DPF entries, or first-practical routes: the map from admitted problem-side record refs or cues, accepted starting records, current starting structures, and entry cues to selected solution architecture, affected unfolding families, loci added or changed, governing-pattern map, content assigned from DRR or README into patterns or unfolding structures, and any independently grounded overread that a plausible intended reader could make.Decision, selected-locus map, and Consequences.

These blocks supply the content of the decision. Four headings cannot tell a later author the grounds, first-minute working situation, naming choice, distribution, sufficiency or necessity of a pattern or non-pattern FPF kind-reference pair, treatment of overlap, impact, or remaining uncertainty. Make those answers recoverable in the DRR without creating separate process paperwork.

For a coordinated change, settle the common answer in the DRR before drafting. Each author can then express that answer at the selected locus without having to decide it again.

When a decision connects several selected loci or mutually dependent edits to patterns and non-pattern FPF kind-reference pairs, its DRR MAY include more than the minimum kernel. It can state obligations at each locus, the choice between a new and an existing pattern, how impacts or non-goals map across the selected loci, coverage or agreement across them, and whether overlapping changes converge. A provisional account of the decision rule can hold the full bounded answer until its enduring content is distributed in Core.

These additions leave the DRR’s kind unchanged. It conforms only while it records what FPF should say and why, what is excluded, how the selected loci are affected, and what improves in practice or authoring. A record with richer coordination content MUST NOT become a campaign plan, process script, baton carrier, packet checklist, staging log, or other development-process brief.

If an existing pattern or selected non-pattern kind-reference pair might suffice, or a new locus might be needed, the DRR must settle that choice. A tentative list leaves the choice to the next author.

Classify each pattern or non-pattern kind-reference pair that the accepted grounds or the DRR bring into the distribution question. State its obligation if selected. Otherwise identify it as an unchanged boundary neighbour, inherited unchanged, or outside the current decision with a named pattern, kind-reference pair, or decision record. Saying it may need local hardening leaves that choice open.

If the grounds reveal a potentially reusable non-pattern carrier or a related source-use, evidence, assurance, validation, or architecture-decision mechanism, the decision must classify it as generalized now, kept local with a reason, rejected, or outside with a named locus or decision record. The DRR records the choice; mentioning an artifact does not decide its use.

For source loss, simplification, redaction, summarization, or other declared loss, the DRR must state which distinctions survive and which are lost. Identify each admissible branch reading and its selected non-pattern FPF kind-reference pair, the uses without an admissible carrier or evidence path, the recoverability class, and the stop or reopen rule when the use exceeds the declared loss or narrower scope.

Before another author can use a nontrivial DRR to draft the selected changes, it must settle the material choices about its EntityOfConcern, selected loci, outside boundary, reusable content, and loss or recoverability regime. Each is selected, rejected, inherited unchanged, or placed outside with a named locus or decision record. While any of these choices is missing, the work is still establishing the decision grounds; it has not produced an accepted DRR.

The DRR episteme lives outside normative Core. A separately governed acceptance, authority, or realization decision may rely on it, but the word accepted, a record status, review mark, or publication does not make its claims true or authorize change.

Once realization is separately authorized, authors apply the selected answer to its loci in dated authoring work. The changed Core content, authoring work, result claims, checks, witnesses, publications, and any landing or release record remain distinct; apply the relevant pattern to each claim. The DRR remains external provenance and temporary convergence support; after realization, the enduring semantics must be available in Core.

Authors using a separately accepted selected answer may elaborate examples, SoTA-Echoing, recognition sections, local wording, and neighboring fit inside its declared stability boundary. A change to the selected answer, selected loci, outside boundary, reusable-content disposition, or loss/recoverability regime requires a successor decision result and DRR episteme rather than a silent edit to downstream prose.

Improvement work may apply E.23 to a DRR episteme. That work, its method applications, quality-result claims, and witnesses are separate from the DRR and do not turn the record into a pattern draft. When a successor decision relies on SoTA, its result must show what changed in the selected answer, locus obligation, boundary, example, validation obligation, or reopen condition; otherwise the source use remains rationale-only or lineage-only.

When a campaign changes route-shaped, unfolding-shaped, first-entry, DPF or multi-pattern path material, make the connection from its actual starting situation to the selected solution and next use recoverable. The following optional form can carry those contents; include only fields that describe the current decision:

CampaignProblemSolutionUnfoldingCheck:
  campaignProblem:
  acceptedProblemSideRecordRefsOrCues:
  selectedSolutionArchitecture:
  affectedReadmeEntries:
  affectedUnfoldingFamilies:
  acceptedStartingRecordRefs[]:
  acceptedStartingStructureRefs[]:
  entryCueRefs[]:
  nextUseOrResultMap:
  unfoldingLociAddedOrChanged:
  governingPatternMapAddedOrChanged:
  patternPlacements:
  whatStayedOnlyInDRRAndMustMoveToPatternOrUnfoldingStructure:
  whatStayedOnlyInReadmeAndMustMoveToPatternOrUnfoldingStructure:
  blockedOverreads?: [only exact readings admitted by `F.19`'s grounded-contribution test]
  rejectedUnfoldingAlternatives?: <only those needed to explain the selected answer, boundary, or reopen condition>
  unfoldingCarryThroughResidueAfterContentUpdate:
  refreshOrReopenTrigger:

After host drafting, identify any enduring selected content that remains available only in the DRR. Move it into the selected pattern body, unfolding block, README seed, E.11 expansion or concrete relation locus so that the public reader can obtain and use the solution.

To preserve P-2 Didactic Primacy without duplicating meta-text, realization work using a separately accepted selected answer should distill stable Rationale, Consequences, SoTA-Echoing, Grounding, and other valid convergence content into the selected informative pattern loci under E.8. The DRR episteme remains external provenance; it is not itself landed or transformed into Core.

A substantive DRR is one claim-bearing episteme about one bounded current content-decision question/change set. It may carry selected obligations only in its Decision or Consequences, but no route, gate, handoff, packet, monolith, mutable status, or future-campaign state. Any undecided remainder is explicitly outside the decision with a named pattern, kind-reference pair, or successor decision record.