Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 23:15:20 UTC

E.23:7 - Conformance Checklist

CheckPassing condition
CC-E23-1Name the exact object version, its evaluation and the settled evaluation question before claiming a changed evaluation result. Use QualityEvaluationQuestionFrame and QualityEvaluationUseDeclaration when the receiving use needs their declarations.
CC-E23-2Reuse a question only while its object version, selected characteristic space, predicate or comparator, ClaimScope, result-consuming work or decision, purpose, qualification window, and any grounded non-use boundary remain applicable. Resolve missing or changed bindings through E.22; a separate frame is conditional on its receiving use, not on repetition alone.
CC-E23-3Represent returned repair possibilities as row-atomic E.22 findings or proposal rows with closure tests; pair proposals selected for the next pass with scale-qualified predicted evaluation-result changes, using ExpectedEvaluationResultChange@Context when the conditional §4.2a account is needed. A grouped memory summary does not discharge skipped rows, and proposal selection does not establish performance.
CC-E23-4For each evaluation or improvement pass asserted as U.Work, establish the A.13 basis of the performer at the scale claimed, including the grounds for each personal contribution actually attributed, then use A.15.1 to identify the occurrence, time, Method, and containing System independently. The obtaining A.13 assignment remains part of actual-performer admission. Add separate A.2.1 assignment-occurrence and F.6 references when the account expressly represents precise assignment-bound attribution; missing or failed attribution alone leaves independently admitted Work intact, subject to the premise-recheck rule in section 4. Then name the evaluation application and result binding or direct result or change relation, plus any separate result episteme. Re-evaluate the changed object before claiming coordinate, status, Q, or front-relation change.
CC-E23-5Record what became worse and protected trade-offs.
CC-E23-6Continue only when a scale-qualified expected evaluation-result change and the cost and risk account support another pass.
CC-E23-7Decide a local stop from the achieved aim, protected trade-offs and absence of a worthwhile feasible improvement under §4.3. All-5, exceptional or front-reaching results neither require nor suffice for that decision.
CC-E23-7aDo not treat 5, all-5, or 5-defensible as a repair target. Repair below-floor results first. Exceptional-improvement work proceeds through non-dominated proposal rows that name the expected substantive content change, protected trade-offs, and cost and risk. A no-proposal or stay-at-current-value disposition is admitted only when it names the checked evaluation evidence basis, using LoopEvaluationEvidenceBasis@Context when the conditional structured account is needed, and explains why every plausible content improvement is dominated, unavailable, or outside the declared scope. Reject changes that add guards, relation catalogues, evidence theatre, or quality proof while reducing use, affordability, locality, or ecology.
CC-E23-8When a neighboring claim appears during a loop, name the live claim and its subject pattern before continuing. That subject pattern still governs the claim when its object version becomes the object under improvement. E.23 organizes the improvement; it does not acquire the subject pattern’s authority.
CC-E23-8aFor a precision-restoration defect, apply F.19 as guidance and open a subject pattern only for unresolved FPF-specific meaning; claim Method or MethodDescription only after A.3.1 and A.3.2 admit it. Apply CC-E23-4 only when actual repair Work is asserted. Consume E.21’s compact PrecisionRestorationProfile when that evaluation is active. Require one bounded KindRestorationCheck when the changed expression can alter the object, kind, relation, slot or use position, claim kind, admissible use, or scope; otherwise F.19’s local revalidation completes the ordinary repair.
CC-E23-9Apply F.19 to wording introduced or repaired by the loop; use E.10 cues and a subject pattern only for an unresolved FPF-specific name, kind, claim or use.
CC-E23-10Preserve the named evaluation’s evidence basis, result-row shape, short-rationale rule, required result summaries, and coordinate-specific payloads in every re-evaluation. For E.21, consume the compact PrecisionRestorationProfile under E.21:4.3a.
CC-E23-11If a practitioner entry phrase such as “loop engineering”, “agent loop”, or “harness loop” appears, lower it to object version plus object-under-improvement evaluation before opening E.23, or name the direct neighboring subject pattern and stop the E.23 overread.
CC-E23-12In agent or harness cases, state which slice the loop may change: the target object version, the evaluation, or the harness object. Any other slice becomes neighboring work under its own subject pattern, not implicit E.23 scope.
CC-E23-13Keep the selected proposal, actual improvement Work governed by CC-E23-4, its result or change relation, changed object or Transformation, later evaluation pass, and result episteme distinct. When a required relation has no governor, retain those objects and the blocker; do not mint a generic Work-result relation.
CC-E23-14When §4.2a’s receiving-use condition holds, represent current alternatives, exact guards, selected obtaining relations, selected continuation, stop, and subject-assertion reconsideration conditions in one admitted A.22 unfolding structure. When transformation-flow membership is current, E.18/E.18.3 recognizes that same selected U.Structure; do not mint a parallel loop object. A visible cycle, record, structure, value or branch can indicate a continuation. A decision may authorize a pass under the governing terms. Establish the effective decision for permission and the actual Work for performance.
CC-E23-15A low value, finding, floor miss, or improvement aim does not establish an actual Problem. Any actual Problem used by the loop resolves to one current C.22.PFR occurrence with its direct participants and temporal identity.