Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

E.23:4.1 - Ordinary loop method

For one quality-improvement loop:

  1. Choose the object from the intended improvement. If the same component could serve the user well in one arrangement and poorly in another, examine the way the components work together. A changed instruction can improve what a reader is taught to do. A claim about what a team actually delivers also depends on its working conditions and performance. Select the extent and evaluation that can distinguish the changes at issue. For a request confined to the instruction, its improved guidance can be the full result. Reuse the current QualityEvaluationQuestionFrame and QualityEvaluationUseDeclaration when they fit. Keep the evaluator, evaluation Method or pattern, characteristic space, evidence basis, result form, ClaimScope and qualification window distinct.

  2. State the content change sought, protected trade-offs, cost and risk account, and local stop condition. Do not use 5, all-5, or 5-defensible as the target; say what should become better in practice.

  3. Resolve any remaining ambiguity in purpose, scope or result-consuming work or decision through E.22. Keep an adequate question; constitute a separate E.22 frame only when its declaration is needed.

  4. Run the declared evaluation. When E.21 is the selected evaluation, retain its complete result: every coordinate, ShortRationale, PrecisionRestorationProfile, evidence basis, coordinate payload, and status. A loop note, blocker summary, or “no blockers” statement is not a substitute. If dated evaluation Work is asserted, identify it and its result binding or direct result relation; keep any durable result episteme separate.

  5. Record each returned finding or proposal separately. A grouped memory summary does not close skipped items, and a proposal remains a proposed next action rather than performed Work.

  6. Choose the change that could improve the commissioned result. If this pass calls for implementation, carry it out before evaluating the changed object. When different contributions must work together, change the relevant connection or constituent and keep the conditions of their joint use available for the next evaluation. When the account asserts dated improvement Work, identify that Work and connect it to a returned value or changed object only through an obtaining A.6.1 binding or declared Work-to-result or Work-to-change relation. If that relation is unavailable, keep proposal, Work, changed object, and Transformation separate and return the missing relation.

    Repair below-floor findings first. Above the floor, prefer a substantive gain—such as clearer action, a missing case or countercase, current source support, restored predecessor content, cleaner relations, or a split of overloaded material. Do not add guards, catalogues, or quality proof merely to defend a higher score. Close with no change only after the evidence shows that no feasible non-dominated improvement remains worth its cost under the protected trade-offs.

    For a precision-restoration defect, apply F.19 and open a restoration or subject pattern for an unresolved FPF-specific meaning. Claim a Method or MethodDescription only when A.3.1 and A.3.2 admit it. Keep locator, Method, description, performer, assignment, Work, result, and responsibility separate. Run one bounded KindRestorationCheck when the changed expression can alter FPF-governed meaning; otherwise F.19’s local revalidation completes the ordinary repair.

  7. Re-evaluate the changed object as a separate pass through the same declared evaluation with comparable evidence and conditions. If the evaluation itself needs to change, use §4.1a before comparing values across that change. Keep the later Work, application or direct result relation, evidence, returned value, and result episteme distinct from the first pass.

  8. Record what improved, what stayed at the floor, what was unchanged by value, what became worse, and which findings moved outside this evaluation. Compare the earlier and later results at the scale of the intended gain. Use a result about one component for the whole when its contribution and the conditions governing the remaining parts support that inference. When result epistemes or dated Work are asserted, preserve their separately governed identities.

  9. Decide stop, continue, switchMethodFamily, openNewFrame, or holdUntilInformationBasisSufficient. When later replay depends on alternatives and guards, use the conditional structure block below. Determine whether the actual decision gives authority for the next pass under the governing terms. A continuation value records a choice. To report performance, establish that the next Work occurred.

  10. Leave an account that lets the next reader recover the object versions, evaluation, proposals, performed passes, result or change bases, evidence, trade-offs, cost and risk, continuation, stop and return boundaries, and the reason for the decision. Use the structured QualityImprovementLoopRecord only when a named replay, handoff, audit, or machine-facing use needs that form; otherwise a short result with the same recoverable facts is enough.

Stop here when this route answers the current use. Open the names, record schemas, and unfolding-structure block below only when a named receiving use depends on that added assurance detail.

E.23:4.1.1 - When evaluation can imitate improvement

Use this branch when sampling, repeated assessment, selection or the calculation of a reported result could produce the apparent gain while the claimed change is absent. The practical question is not just how variable the score is, but what this procedure would report without that change. Keep an existing comparison when it already answers that question adequately.

Name the claim and the reported quantity. Better average performance, newly successful cases, fewer losses and faster subsequent learning are different quantities. State the object, cases, conditions and change that the comparison concerns. A control for one quantity needs a separate basis to support a claim about another: a stable average does not prevent cases from moving in both directions between success and failure.

Construct the absence of the claimed change. Use an applicable model, a matched control, or both. For an unchanged stochastic solver, the model can describe repeated attempts under unchanged conditions. For a grading procedure, reassess the same archived answers without revealing their earlier grades. Say what remains fixed and what can vary. If a changed task population, assistance or operating condition can explain the difference, include it in the comparison or narrow the claim. Use C.16.MR to construct the measurement relation, C.16.IR to determine what it can resolve, and C.16.RM when the arrangement needs repair; the relevant mathematical or empirical method supplies the particular calculation or study.

Carry that absence through the whole procedure. Apply the same inclusion rule, thresholds, selection of a best attempt or version, recording, calculation and stopping rule used for the reported gain. If only initially unsuccessful cases are counted, reproduce that conditioning too. Preserve shared cases and other dependence: all ordered pairs of a few repeated runs are not that many independent experiments. An idealized model is sufficient only where its assumptions support the intended use; an empirical control can expose effects omitted from it, such as altered batching or assessor behavior.

Use the resulting behavior to decide the stated question. Obtain the relevant distribution or control estimate and its uncertainty, then choose a comparison rule for the intended claim and tolerated error. A mean control value is not itself a threshold, and subtracting it is not a universal correction. Check a rule tuned on control results on material not used for that tuning. Carry the uncertainty of the control into the final comparison. If the arrangement cannot distinguish a worthwhile change from these effects, obtain more informative evidence, improve the arrangement or leave the claim unresolved. Failure to detect a difference does not establish equivalence or absence of improvement. A difference beyond the control still needs any additional evidence required by a causal or wider capability claim.

Worked calculation. Suppose an unchanged solver has probability 1/2 of success on each of 20 cases, with independent attempts and independent cases. In two evaluations, failure followed by success has probability (1/2) × (1/2) = 1/4; success followed by failure has the same probability. The expected counts are five new successes and five losses, while expected net change is zero.

The new-success count has distribution Binomial(20, 1/4): the probability of eight or more is about 0.1018, and of nine or more about 0.04093. For a single comparison whose rule was fixed in advance, nine would therefore meet a chosen 5% upper-tail rule under this model; eight would not.

Choosing the best of several comparisons changes that calculation. Neither threshold establishes a cause, a general capability or improvement on a different task population. These are calculated properties of the constructed example, not intervention data.

Human and organizational limits. Regrading unchanged answers tests variation in assessment, not whether their author learned. Reprocessing unchanged service records tests the reporting procedure, not whether the service improved. A person can retain practice, fatigue or changed expectations, and an organization retains its history even if a document is restored. Construct a comparison appropriate to the claimed change in their work and support; do not manufacture an unchanged person or organization by copying an instruction. If only the reporting artifact can be held fixed, preserve that useful bounded result and leave the stronger claim open.