E.18:3 - Problem
- Confusing a mathematical description with the selected structure. A catalog of morphism-scoped, transformation-scoped, mechanism-scoped, work-scoped, or refresh-scoped patterns does not, by itself, explain how the whole selected structure is built, constrained, and audited.
- Flow proliferation. Multiple “reference flows” can be declared; practitioners need one structure discipline that keeps their flow relations typed and comparable without privileging any single flow.
- Unsafe publication. A face can silently change a signature’s terms, hide scalarization, omit required edition or plane pins, or present a Bridge Card,
CLvalue, UTS row or policy id as evidence that a GateCrossing or gate decision is current. - Cycles without norms. Selection↔Planning loops run without an explicit budget (Γ_time), an identified stale-measurement finding and any separately identified refresh plan it triggers, or slice-scoped refresh. A pre-run gate decision is mistaken for actual launch bindings, or a
FinalizeLaunchValuesrecord is written before a Work occurrence and its independently obtaining bindings exist.