Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:40:20 UTC

E.18.1:1.1 - Use this when

  • an accepted ProblemCard@Context names a working problem and the team needs a way to choose its next use of FPF toward method, planning, performed work, or result interpretation;
  • an invariant, U.Signature(profile=FormalSubstrate), PrincipleFrame, mechanism-position, method-position, A.15.2 U.WorkPlan or plan-item wording cue, performed-work, result-record, or source-currentness cue is present, but the FPF kind or relation to use next is still unsettled;
  • a transformation-flow structure, mathematical path relation in a graph-shaped description, flow diagram, principle scheme, scenario, functional description, or source publication helps the team think, while the next FPF use still lacks an FPF kind or relation named by value;
  • a result artifact, telemetry line, acceptance record, quality-evaluation record, done-state update, feedback pin, or integration claim needs to be unpacked before it can guide the next FPF use.