E.17.ID.CR:5.4.5 - Product and design-review comparison case

Source slice. Two available design-review notes concern the same integration boundary and planned release. The release meeting needs to know what each note establishes about rollback and implementation effort. Note A states: Rollback uses the existing adapter, which must first be modified. No implementation-effort estimate is available. Note B states: Implementation uses one interface and is estimated at two engineer-days. Rollback has not been assessed.

Comparative review unit. For release review, A describes a rollback path conditional on modifying the adapter, while B leaves rollback unassessed. B supplies a two-engineer-day implementation estimate; A supplies no estimate. These source statements do not establish which option has lower total effort or risk. If the next decision needs that comparison, obtain the missing estimates and rollback assessment on a compatible basis.

Working-boundary use. The shared review frame, bounded contrast and boundary with outside work are all explicit. The comparison therefore remains primary.

Why it stays here:

  • the same planned release remains the EntityOfConcernRef;
  • one bounded comparative lift is made explicit for a declared review task;
  • the unit helps design discussion without selecting an action or granting approval.