Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:45:17 UTC

E.17.AUD.OOTD:5.1 - Architecture note shifting into rollout work

A short architecture memo begins with: This note is about the proposed service boundary between catalog and checkout.

Three paragraphs later it says: We should therefore assign rollout responsibility to platform and stage migration in two sprints.

The memo moved from the interface to a proposal to assign and schedule rollout. Mark the transition if the reader needs both, or put independent rollout work in its own unit. Moving from describing to assessing the same interface need not change the C.2.1 EntityOfConcern of the episteme.

For an introduction, “This note introduces the service boundary between catalog and checkout. Rollout is outside its scope” can finish the job. For an assessment, keep the two sides together and give the finding. Suppose checkout must handle every agreed catalog response. The catalog can return “item unavailable” and checkout accepts only a priced item. The current interface therefore fails that requirement. One such response settles this failure. To establish compatibility for that requirement, show that checkout handles every agreed response under the stated conditions.

Either finding can guide an interface decision. Where a broader assessment also depends on an unknown deployment condition, identify what remains open. A standing rule can assign qualifying rollout work to the duty shift. If a separate allocation is reserved to a particular party, establish that act before reporting who has been assigned.