Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

E.13:12 - Consequences

  • FPF can use scores and metrics without making them the object of optimization.
  • Improvement loops gain a simple value-proxy stop condition.
  • An expected consequence can follow from the structure of the work. A claim about achieved improvement needs evidence of the work and an appropriate comparison.
  • Some attractive proxy improvements are rejected, split, or lowered.
  • The cost is a small proxy-to-value check whenever a visible measure becomes a target, incentive, gate, release argument, or repair target.